My WebLink
|
Help
|
About
|
Sign Out
RES 00059
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2005 4:54:39 PM
Creation date
6/1/2000 12:00:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/16/2000
DOCUMENT NO
00059
NOTES
TRI-VALLEY
NOTES 3
TRANSPORTATION PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />9. Updated Adion Plan <br /> <br />First Street (Livermore) <br /> <br />Existing Configuration' Planned Improvemen~ <br /> <br />FirstStreetiswrrentlyapmtofSRB4. Framl-5BOtoPortolaAve- . Reconfigure 1-5BO/first Street interchange to " pOldo" design <br />nue, FirstStreetisa 6-loneraad. From Portola Avenuetc Holmes <br />Street, First Street is a 4-ll1ne fOod with sidewalks, bike lones, and <br />a raised median. (In some locations, the median becomes 0 two- <br />woy, left-turn lane or disappears entirely.) Parking is permitted <br />along some sections of First Slreet. <br /> <br />Trallic Service Objectives Schedule for Achievement <br /> <br />Volume-to-tapacity ratio <0.9 at Intersedions Achieve by: 2010 <br /> <br />Recommended Actions. Responsible Agencies_ <br /> <br />Secure funding for interchange improvements (lhe project is on the Livermore <br />list of improvements to be funded byUvermore'sTraffic Impact Fee <br />program, although no funds hove been allocated for this project os <br />ofyel) <br />Other Areu-Wide AdioflS to Support !SO <br />None <br /> <br />18 April 2000 <br /> <br />Page 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.