Laserfiche WebLink
<br />Tri-Valley Transportation Pian/Action Pion Update <br /> <br />North Conyons porkway <br /> <br />Existing Conliguration Planned Improvements <br /> <br />North Conyons-Pcrkwoy is 0 4.loneorteriollUnning porollelto <br />1.580 between Airway Boulevard ond Collier Canyon Rood <br /> <br />. Widen ond eKlend os 6-lane Drterial rrom DoolDnto Isobel h. <br />tension (Collier Canyon Rood) (Widening complete from Doolan <br />Rood eostto Collier Conyon Rood. The remaining segmenlrrom <br />Collier Canyon 10 Iscbel Extension will be compleled with devel- <br />operond(i~IIFfunding.) <br /> <br />Troffic SClVice Objectives Schedule for Achievement <br /> <br />Volum8-to~capac:ity ratio <0.9 at intenections <br /> <br />Achieveby,2010 <br /> <br />Re<ommended Actions Responsible Agencies <br /> <br />Secure developer funding for widening and extension of lOodwoy <br />-Complete <br />Improve the intersection ofN.(onyons PcrkWllyond (oilier (onyon <br />Rood - Improvements will be done in conjunction with opprO'led <br />developmentintheoreo <br />Other Area-Wide Adiofls to SlJpport fSO <br />None <br /> <br />Uvermore <br /> <br />Uvermore <br /> <br />Page 58 <br /> <br />18 April 2000 <br />