Laserfiche WebLink
<br />Tri-Valle, Transportation Plan/Adion Plan Update <br /> <br />Hacienda Drive <br /> <br />Existing Configuration Planned Improvements": <br /> <br />-fxtendas4-lanearterialtoGleosonDrive <br />-Widento6Iones,I-580toDublinBoulevard <br /> <br />Truffic Service Objectives Schedule for Achievement <br /> <br />Volume-to-capacity ratio <0.9 at Intersections Achieve by: 2010 <br /> <br />Recommended Adions Responsible Agendes <br /> <br />Secure developerrunding for widening extension-Developer is Dublin <br />required to widen Hodendo Drive os part of development along the <br />raadwav; construction is underway (1999) <br />Other Area-Wide Actions to 511pport TSO <br />None <br /> <br />Page 64 18 April 2000 <br /> <br />. <br />