Laserfiche WebLink
<br />CAPITAL IMPROVEMENT PROGRAM <br />WATER <br />Finol Adjusted Budgel1999-00 <br /> <br /> Elpansioa Replltemefll <br />CIP# Fund Fund Total <br />~lO17 Water Conservation Devices and Materials 38,070 0 38.070 <br />9510lS Water Quality Monitors - Phase II (50%) 14,206 0 14,206 <br />911013 Water Connection Fee Update 15,000 0 15,000 <br />971014 Water System Master Plan Update 75,000 0 75,000 <br />971015 Bonde Water System Master Plan Update 40,000 0 40,000 <br />9710]6 Recycled Water Feasibility Study 4,572 0 4,572 <br />971017 Utility Billing Vehicle - Meter Reading 4,226 0 4,226 <br />91Hl19 Reconstruct Canyon Meadows Pump Station 104,498 0 104,498 <br />97lDll Looped Water Main System on First Street at Stanley 479,809 0 479,809 <br />97]O2~ Water Well Chemical Feed System Modifications. (33%) 46,020 0 46,020 <br />""''' Muni Golf Course 0 0 0 <br />'''001 Tassajara Reservoir Expansion 727 0 727 <br />971010 Electrical Panel Upgrading 51,827 0 51,827 <br />,.."" Utility Mapping Project 5,535 0 5,535 <br />"""" Utility Billing Software 0 1,091 1,091 <br />921037 Wells 6 &. 7 Repairs 0 24,811 24,811 <br />931011 Water Service Study 0 2,980 2,980 <br />93Hl22 Update Standard Specifications and Plans 0 3,676 3,676 <br />941019 Reconstruct Control Valves: Santos Ranch Road.-Phase II 0 23,149 23,149 <br />941024 Automated Ion Analyzer 0 30,287 30,287 <br />941027 Seismic Vulnenbility Study 0 35,000 35,000 <br />9SI000 Annual Water Main Replacement and ImDl"Ovement Project 0 421,870 421,870 <br />9S10B Water Quality Monitors ~ Phase II (50%) 0 14,206 14,206 <br />"HlOO Annual Water Main Replacement & Improvement Project (100%) 0 144,664 144,664 <br />%]017 Backflow Devices (100%) 0 152 152 <br />""''' Utility Mapping Project 0 7,822 7,822 <br />97102S Water Well Chemical Feed System Modifications. (67%) 0 149,000 149,000 <br />"1000 Alarm Dialing System . 0 15,345 15,345 <br />97]012 Water Main ReDlacement on Bonita A venue and Entrada Dr. 0 303,800 303,800 <br />971018 Lining & Coatiu - Steel Water Tanks 0 529,056 529,056 <br />"100II Portable Generator Longview Booster Station 0 102,276 102,276 <br />981002 Replace PolybutyJcne Service Laterals 0 47,543 47,543 <br />98]00$ Replace Central Computer 0 :70,000 70,000 <br />"1006 Water Main Replacement 0 41,325 41,325 <br />981010 Electrical Panel Upgrading 0 62,855 62,855 <br />"900' Umgview Dr Pwnp Station Capacity Upgrade 0 11,968 11,968 <br /> TOTAL WATER PROJECTS $1,709,269 $4,166,835 $5,876,104 <br /> ENDING WATER FUND BALANCE $1,220,123 $4,436,250 $5,656,373 <br /> <br />WatcrOOQI.xls FinalAdj <br /> <br />49 <br />