My WebLink
|
Help
|
About
|
Sign Out
RES 00070A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00070A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 1:08:26 PM
Creation date
6/12/2000 9:18:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/6/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CAPITAL IMPROVEMENT PROGRAM <br />WATER PROJECTS <br /> <br />Recommended Amend. 1999..00 <br /> <br /> , Expansion Replacement <br />C1P# Fund Fund Total <br />9SI015 Water Quality Monitors - Phase 11 (:50%) 0 <br />971013 Water Connection Fee Update 0 <br />971014 Water System Master Plan Update 0 <br />97JOlS Bonde Water System Master Plan Update 0 <br />971016 Recycled Water Feasibility Study 2,328 2,328 <br />971017 Utility Billing Vehicle - Meter Reading 0 <br />9710]9 Reconstruct Canyon Meadows Pump Station 5,199 5,199 <br />971023 Looped Water Main System on First Street at Stanley 0 <br />9'71025 Water Well Chemical Feed System Modifications. (33%) 0 <br />96&036 Muni Golf Course 0 <br />"9001 Tassajara Reservoir Expansion (727) (727) <br />9111110 Electrical Panel Upgrading (51,827) (51,827) <br />"""" Utility Mapping Project 0 <br />108046 Utility Billing Software 0 <br />921037 Wells 6 &. 7 Repairs 0 <br />9310111 Water Service Study (2,980) (2,980) <br />931022 Update Standard Specifications and Plans (3,129) (3,129) <br />941019 Reconstruct Control Valves: Santos Ranch Road.-Phase II 0 <br />~I024 Automated Ion Analyzer (30,287) (30,287) <br />941021 Seismic Vulnerability Study 0 <br />951000 Annual Water Main Replacement and Improvement Project 0 <br />951015 Water Quality Monitors - Phase II (50%) 0 <br />"1000 Annual Water Main Replacement & Improvement Project (100%) (84,419) (84,419) <br />961017 Backflow Devices (100%) (152) (152) <br />-, Utility MaDDing Project 0 <br />971025 Water Well Chemical Feed System Modifications. (67%) 0 <br />971009 Alann Dialing System 0 <br />971012 Water Main Replacement on Bonita Avenue and Entrada Dr. (303,800) (303,800) <br />971018 Lining & Coating - Steel Water Tanks 0 <br />981000 Portable Generator Longview Booster Station 0 <br />981002 Replace polyhutylene Service Laterals 0 <br />981003 Replace Central Computer 0 <br />981006 Water Main Replacement 0 <br />981010 Electrical Panel Upgrading 51,827 51,827 <br />,,_ Foothill WaterLine - No. of Castle wood 3,377 3,377 <br />"900' Verona Road Bridge Water Line 2,968 2,968 <br />"'007 Longview Dr Pump Station Capacily Upgrade 0 <br /> TOTAL WATER PROJECTS ($40,124) ($6,548) ($46,672) <br /> ENDING WATER FUND BALANCE $118,020 $86,142 $204,162 <br /> <br />Water 00 Q2.:ds Rec Amend 5123/00 <br /> <br />83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.