Laserfiche WebLink
Project <br />Description <br />Estimated Costs <br />First Street: Sidewalk and <br />Landscape Improvements <br />This project will replace the asphalt sidewalk and install <br />landscaping in the parkway strip along the from of the <br />School District offices on First Street. <br />$20,000 <br />Gold Creek Open Space: <br />Master Plan <br />This project involves developing a master plan for the 30.9 <br />acre open space area located in the Laurel Creek project, on <br />the west side of Foothill Road. The project will define the <br />program, the amenities desired, the probable cost, and <br />provide the required environmental studies. <br />$25,000 <br />Hopyard Road: Street <br />Landscape Improvements to <br />the Northeast Side of <br />Hopyard from Secretariat to <br />Del Valle Parkway <br />This project involves the complete renovation of street <br />landscaping on the northeast side of Hopyard Road from <br />Del Valle Parkway to Secretariat. NOTE: This project is <br />scheduled to be funded with Park Renovation funds in FY <br />1999/00. <br />$162,225 <br />Junipero Street: Frontage <br />Improvements <br />Project includes constructing improvements to Junipero <br />Street frontage across from Mission Hills Park, fronting the <br />open space area. The project includes the installation of <br />cobbler paving, steel post, a rail fence with pedestrian <br />openings, and the replanting of shrubs. <br />$9,500 <br />Main Street: Public Art <br />Project <br />The Civic Arts Commission has identified the proposed <br />Main Street Green Park (Vervais Yard) as a venue for the <br />Commission's third publicly funded public art project. <br />$70,000 <br />Miscellaneous: Annual Street <br />Tree Planting and <br />Replacement <br />This project will allow for the planting and replacement of <br />trees in parkway snips and median islands. <br />$10,000 <br />Miscellaneous: Median <br />Island Landscape <br />Renovations <br />This project involves the complete renovation of the <br />landscape and irrigation systems in street medians on West <br />Las Positas, between Santa Rita Road and Gulfstream; for <br />$250,000 <br />four islands on Alameda Drive; and for two small islands on <br />Woodtlrush Road between Crestline and Blackbird. <br />Miscellaneous: Reforestation <br />Project <br />This project will allow for an initial street tree inventory to <br />be developed for the future protection and maintenance of <br />the urban forest. The inventory is needed in order to <br />maintain the atmosphere that mature trees provide <br />throughout the City. <br />$80,000 <br />Mission Hills: Open Space <br />Drainage Improvements <br />Construct a concrete V -ditch and tie into the storm drain <br />system. <br />515,100 <br />LISTING OF UNFUNDED PROJECTS <br />PARKS PROJECTS <br />FY 2000. 01/2003 -04 <br />98 <br />REVISED pip unfunded pmjecnxls <br />5 /1S/2WOe <br />Emig <br />INNIEL <br />Wig <br />