Laserfiche WebLink
MISCELLANEOUS PROJECTS <br />PROJ K <br />PROJECT TITLE <br />BUDGET <br />PROJECT STATUS <br />EST. FINISH <br />887057 <br />Lease Payments for Senior Center <br />5500,760 <br />Scheduled Payment <br />Dec -00 <br />948051 <br />Lease Payments for Animal Shelter <br />5101,000 <br />Schedu ed Payment <br />Dec-00 <br />948056 <br />Lease Payments for Series A B (Miss. Portion) <br />$835.753 <br />Scheduled Payment <br />Dec -00 <br />958053 <br />City HallICommunity Center Reserve <br />596,792 <br />Reserve Establishcd <br />N/A <br />978045 <br />Design Construction of Joint Fire Headquarters <br />51,750,000 <br />IN Design Review <br />Mar -01 <br />998043 <br />Monument Signs at Strategic Locations <br />5100,000 <br />Committee Established; Preliminary review <br />underway <br />May-01 <br />998044 <br />TrafHO Light: Priority Control System Installation <br />3150.000 <br />In progress <br />Jun -00 <br />998045 <br />200 Old Bernal Remodel (Additional Costs) <br />3500,000 <br />Circulating Concoction Bids; construction to <br />begin in September 2000 <br />Mar-01 <br />998046 <br />Up grade of City Network <br />5125.000 <br />Circulatin bids for up grade <br />Sep-00 <br />998047 <br />Amador theater Sign Reconditioning <br />$50,000 <br />Analysis completed; Sign design under <br />Dec -00 <br />998048 <br />Purchase of 157 Main Street <br />$2,700,000 <br />building Purchased; Remodel for tempoorary <br />occu ion to in in Jul 2000. <br />Jul -00 <br />998049 <br />Golf Course Reserve (see 968036 project number) <br />i'i'i <br />575,000 <br />1 sign:' recessing envuonmenn <br />lndentitication of medians under review <br />un <br />Dec-00 <br />998051 <br />New Landscape Medians Reserve <br />998052 <br />Replacement of Shooting Range Target System <br />5100.000 <br />*sip under review <br />Dec -00 <br />998053 <br />Stonendge Mall Road near Deodar: Storm Dram <br />532.008 <br />On hold <br />N/A <br />998056 <br />Tounga Creek Fence Replacement: Storm Dram <br />515,000 <br />PO issued for Junipero fencing <br />Aug-00 <br />998057 <br />Storm Dram Replacement at 5130 Foothill Road <br />516,200 <br />Design: 60%- 10 complete 5/00 <br />Sep-00 <br />998083 <br />Fence at ACE rmn Platform: W. Angela to Old Bernal <br />522,000 <br />In progress <br />Jim-00 <br />SEWER PROJECTS <br />PROJ t/ <br />PROJECT TITLE <br />BUDGET <br />PROJECT STATUS <br />EST. FINISH <br />872066 <br />Lease Payments for Cross Town Sewer Interceptor <br />5458,182 <br />Scheduled Payment <br />Dec-00 <br />948056 <br />Lease Payments for Series A B (Sewer Portion) <br />3223,687 <br />Scheduled Payment <br />Dec-00 <br />992001 <br />Sewer Maintenance Hole Improvements <br />520,000 <br />In progress: 30% <br />Sep-00 <br />992002A <br />Annual Sanitary Sewer Main Replacement Improvements <br />5175,000 <br />Design: 25% <br />Nov-00 <br />992002B <br />Annual Sanitary Sewer Main Replacement Impr: Bevilacqua Court <br />See above <br />Predesign: On hold <br />N/A <br />992008 <br />Rad <br />o Telemetry Conversion <br />519,940 <br />In progress: 20% <br />Oct -00 <br />992012 <br />Replace <br />Electrical Control Panels al S4 and S -5 <br />550,000 <br />Design for 5-4: 10% <br />Nov-00 <br />992014 <br />East Amador Relief Line Pomp Station: Reserve <br />$250,000 <br />Not started <br />N/A <br />992026 <br />Generator Study (Sewer Portion) <br />56,000 <br />Study: 90% <br />Jul-00 <br />992036 <br />Sanitary Sewer Pump Station 548 Air Injection Vault <br />550,000 <br />Not stoned <br />Dec-00 <br />992050 <br />Foothill Rd, Deodm Way Fabian Ct: Sanitary Sewer Addition <br />$353,000 <br />Predesign: On hold <br />N/A <br />992058 <br />Sewer Scada System Upgrade <br />550,000 <br />In progress <br />Dec-00 <br />992060 <br />Sanitary Pump Flow Meters and Digital Flow Monitors <br />550,000 <br />In progress: 20% <br />Dec-00 <br />992061 <br />Ray Street Eight -Inch Sewer Replacement <br />536,800 <br />Complete <br />Jan-00 <br />992062 <br />Air Compressor Upgrades at Sewer Pump Stations <br />550,000 <br />In progress: 20% <br />Der.W <br />992063 <br />Level Control Device Upgrade at Sewer Pump Stations <br />530,000 <br />Predesign: 10% <br />Sep-00 <br />992064 <br />Sanitary TV Truck Enhancements <br />520,000 <br />In progress: 40% <br />Dec -00 <br />WATER PROJECTS <br />PROJ a <br />PROJECT TITLE <br />BUDGET <br />PROJECT STATUS <br />EST. FINISH <br />948056 <br />Lease Payments for Series A B (Water Portion) <br />$865,168 <br />Scheduled Payment <br />Dec -00 <br />991000 <br />Annual Water Replacement Projects <br />5250,000 <br />Design: 75 On hold <br />N/A <br />991005 <br />Replace Central Computer Hardware and Software <br />550,000 <br />On -going <br />Jul -00 <br />991010 <br />Electric Panel Upgrades and Restorations <br />540,000 <br />On- going: 60% complete <br />Dec-00 <br />991011 <br />Control Valve Installations <br />580,000 <br />Design Review <br />M <br />991013 <br />Annual Replacement of Polyburylene <br />5100,000 <br />On- going: 70% complete <br />Yr 2004 <br />991018 <br />New Lining, Coating and Cathodic Protection Sys: Storage Tanks <br />5126,000 <br />Awarding contract <br />Jul-00 <br />991021 <br />Utility Overlay Mapping Project Improvements <br />385,000 <br />5135,000 <br />Completion scheduled for 8/00 <br />Estimate start: 3/00 <br />Aug-00 <br />Sep-00 <br />991025 <br />Water Well Chemical Feed System Modifications <br />991032 <br />Upgrade RTU at Del Valle Treatment Plant <br />520,000 <br />In progress <br />Aug-00 <br />991033 <br />Generator S Water Portion) <br />524.000 <br />Stud 90% <br />Jul -00 <br />991034 <br />Upgrade Turnouts to Accommodate Chemical Readouts <br />5$0,000 <br />In progress <br />a i'i <br />991035 <br />Santos Ranch Road Pump Station <br />$100,000 <br />Not started <br />N/A <br />991068 <br />Laurel Creek Pump Station Pumping Unit <br />530,000 <br />Complete <br />Dec-0O <br />991069 <br />Reconstruction of Water Wells No. 5, 6, and 8 <br />3300,000 <br />Construction: 60 comp lee <br />Aug <br />STATUS OF PROJECTS APPROVED 119 THE FY 1999 -00 CAPITAL IMPROVEMENT PROGRAM <br />99sistusREV.xn <br />108 <br />