Laserfiche WebLink
OP <br />Fiscal Yaws 2000-01 /2003 -04 <br />Hlnal <br />5001-01 <br />Sf01-q <br />209344 <br />Twal <br />REVENUES <br />BEGINNING BALANCE <br />52,277 416 <br />5459,667 <br />51.421.830 <br />5964,087 <br />52,277.416 <br />ESTIMATED REVENUES <br />8,694,094 <br />1835,510 <br />1.608,555 <br />1,707164 <br />14,845,423 <br />TRANSFERS <br />874,500 <br />1,174,500 <br />1,474,500 <br />1,274,500 <br />4,798,000 <br />TOTAL FUNDS AVAILABLE <br />511,846,010 <br />4,469,677 <br />54.504,885 <br />53,945.851 <br />321,920.839 <br />EXPENDITURES <br />993%9 <br />Amual Resurfacing of Various City Streets <br />51,200,000 <br />1,300,000 <br />S1,400000 <br />51400000 <br />5,500,000 <br />995004 <br />Annual Slurry Scaling of VariousCity Streets <br />585,000 <br />100,000 <br />5100,000 <br />5100000 <br />385,000 <br />995007 <br />Annual Traffic Buttons and Line Ikon Installation <br />525,000 <br />25.000 <br />525,000 <br />525.000 <br />100,000 <br />995067 <br />Bernal Avenue at Anoyo Del Vac (Construct Second Bridge) <br />51,052,533 <br />0 <br />SO <br />SO <br />1,052,533 <br />995% <br />Curb and Gutter Replacements for Sheet Resurfacing Projects <br />580,000 <br />80.000 <br />580,000 <br />580,000 <br />320.000 <br />995055 <br />550.000 <br />50,000 <br />550,000 <br />550,000 <br />200.000 <br />Neighborhood Traffic Calming Devices <br />993%s <br />Street Lighting Upgrade <br />f0 <br />30,000 <br />50 <br />530,000 <br />60,000 <br />005016 <br />Alamo CanaVBikewayffrail Camumon <br />$500,000 <br />0 <br />50 <br />50 <br />500.000 <br />005029 <br />Bemal Avenue Widening from Vineyard to Arroyo Del Valle <br />5835,000 <br />29,000 <br />50 <br />50 <br />864.000 <br />003003 <br />Bike Path Construction on Zone 7 G-1 -1: Alamo Canal to Val Vista Park <br />367,100 <br />0 <br />50 <br />SO <br />67,100 <br />005010 <br />Del Valle PaM1way: Extension from First Street to California Ave <br />5223,960 <br />63,040 <br />SO <br />SO <br />287,000 <br />0050011 <br />Dublin Canyon Road (Eastbound) Widening at Foothill Road <br />590,000 <br />0 <br />SO <br />SO <br />90,000 <br />001051 <br />Evaluation Reclassification of Sinn Surfaces (PMS) <br />555,000 <br />0 <br />525,000 <br />SO <br />80,000 <br />men <br />Foothill Road Widening at Dublin Canyon Road <br />5998,000 <br />0 <br />SO <br />50 <br />998,000 <br />Hopyrd Road and Owens Drive Widening Phase II <br />5121,740 <br />0 <br />50 <br />SO <br />121,740 <br />995017 <br />1 -580 Corridor Management/Signals, Phase 1 <br />52,900,000 <br />0 <br />50 <br />30 <br />2,900,000 <br />005012 <br />I- 580/680 Transit Enhancements <br />1500,000 <br />0 <br />50 <br />SO <br />500.000 <br />005057 <br />Ncw Sidewalks and Handicap Ramp <br />380,000 <br />0 <br />590,000 <br />50 <br />170,000 <br />Nsm1 <br />Santa Rita Roth and Stoneridge Ddve Widening <br />5300,000 <br />0 <br />50 <br />50 <br />300,000 <br />omen <br />Santa Rita Road Valley AVelme Improvements <br />1923,310 <br />0 <br />50 <br />S0 <br />923.310 <br />003015 <br />Second Street Reconstruction from Engineer to Neal Street <br />$696,000 <br />0 <br />50 <br />S0 <br />696.000 <br />ros0e <br />Stoneridge Drive Widening At Stoneridge Mall Road <br />5153,700 <br />0 <br />$0 <br />50 <br />153,700 <br />Bernal Avenue Widening from Nnayrd to Tawny <br />SO <br />308,903 <br />5306,097 <br />50 <br />615,000 <br />Denker Drive: Curb and Gutter Replacement <br />50 <br />68,000 <br />50 <br />50 <br />68,000 <br />Dublin Canyon Rod Median Chaonetization <br />SO <br />112,000 <br />50 <br />SO <br />112,000 <br />Mohr Ave Sidewalk Construction: Kohn St to Abandoned Railroad ROW <br />SO <br />50.000 <br />50 <br />SO <br />50,000 <br />Pleasanton Ave R000ns0uttion from Rose Ave to Division St <br />50 <br />246,000 <br />SO <br />50 <br />246,000 <br />Reserve for Traffic Fa Match <br />50 <br />261,904 <br />5260,000 <br />5125,022 <br />646,926 <br />Soundwall Repairs Replacemena: Various Locations <br />50 <br />324,000 <br />50 <br />SO <br />324,000 <br />Anoyo De La Laguna Construct New Bike Path <br />50 <br />0 <br />590,500 <br />50 <br />90,500 <br />Bernal at Vineyard/Tawny: Install New Traffic Signal <br />50 <br />0 <br />5120,000 <br />SO <br />120,000 <br />Bernal at Vincywd: Install New Traffic Signal <br />S0 <br />0 <br />5120,000 <br />50 <br />120,000 <br />Foothill High School Driveway: Install New Traffic Signal <br />10 <br />0 <br />5120,000 <br />10 <br />120,000 <br />Street Light Pole Replacement <br />SO <br />0 <br />5100,000 <br />10 <br />100,000 <br />Sunol Blvd at 1-6805o Botmd Off Ramp: Install New Traffic Signal <br />SO <br />0 <br />5120,000 <br />SO <br />120.000 <br />Sunol Blvd Widening: Junipm to 1680 (Reserve) <br />50 <br />0 <br />S119,201 <br />5460,363 <br />579,564 <br />Tnflic Sipal System master Conrr0lkr Upgrade <br />S0 <br />0 <br />1175,000 <br />SO <br />175,000 <br />Valley Avenue at Northway: Install New Tragic Signal <br />50 <br />0 <br />5120,000 <br />SO <br />120,000 <br />West Las Positas at Dorman: install New Traffic Signal <br />50 <br />0 <br />5120,000 <br />SO <br />120,000 <br />Foothill Rd Recanstruotian: Highland Oaks Dr to Muirwood Dr NoM <br />SO <br />0 <br />S0 <br />$472,700 <br />472,700 <br />Johnson Dr at Stoneridge Dr Construe Southbound Right Tuns Lane <br />S0 <br />0 <br />50 <br />5150,000 <br />150,000 <br />STREET PROJECT TOTAL <br />511,386 ,343 <br />3,047,847 <br />53,540,798 <br />53,093,085 <br />521,068,073 <br />ENDING STREET FIND BALANCE <br />5459,667 <br />1,421,830 <br />5964,087 <br />5852,766 <br />5852,766 <br />CAPITAL IMPROVEMENT PROGRAM <br />STREETS PROJECTS <br />cmol MIAs 5/18/00 <br />65 <br />