My WebLink
|
Help
|
About
|
Sign Out
RES 00111A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00111A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:32:27 AM
Creation date
9/11/2000 9:56:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00111
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GUIDELINES: <br />2.1 Signalize and/or provide lane improvements at intersections along Bernal <br />Avenue at the locations shown in Figure 4-7: Bernal Avenue Intersection <br />Improvements. These improvements and locations include: <br />the Western Area's access road ~-,,.;cryonto Bernal <br />Avenue. The location of this intersection shall align with <br />Meadowlark Drive in the Windsor development north of Bernal <br />Avenue. <br />the intersection of Bernal Avenue/Commercial Access Road. This <br />intersection shall operate as a right-in, right-out driveway only <br />and ~ti ill be unsienali~red fLr this lre nl the iutersae[iun. <br />the intersection of Bernal Avenue/Valley Avenue, and <br />the intersection of Bernal Avenue/Village Avenue East, in Phasr <br />I_ I!il~ inr„,r; Linn a ill ~iprr:uc a,. n riehi-iu_ riohi-nut -.1... <br />nu~~r~ortiun :ur,I will hr ursienulimd. <br />Transportation Improvements Policy 3: Phase I Bernal Avenue Widening. <br />Design and improve Bernal Avenue ftotn the Bernal bridge to Valley Avenue to <br />be consistent with City's General Plan Circulation Element. <br />GUIDELINES: <br />3.1 Bernal Avenue is projected ro need three (3) through lanes in [he <br />eastbound direction under the City's planned circulation system between <br />I-680 and Valley Avenue. Provide for this widening of Bernal Avenue <br />as part of Plan development, with the new lane to be constructed on the <br />south side of the existing right-of-way. <br />3.2 Widening of westbound Bernal Avenue to three (3) through lanes is also <br />anticipated, although existing paving on westbound Bernal is sufScient [o <br />accomplish this improvement. Provide for appropriate stripping of this <br />existing pavement to result in the third through lane westbound. <br />4-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.