Laserfiche WebLink
Storm Drainage Policy 2: Flood Control. Minimize the effects of <br />downstream flooding as a result of increased impervious surface due to Plan <br />Area development and protect the Planning Area from flooding. <br />GDIDELINES: <br />2.1 \s in .i f Phan ~ I imrr , mei~es :Incorporate storm water detention <br />basins into the Phase,'-~IIsy-Interim Unu, Sneee tut~i of the <br />project capable of retaining the increase in post-deve]opment peak runoff <br />from loth Phucc> I :u,d Il. ~eceionnien[ oY the site resulting from a 100- <br />year storm event. <br />2.2 Coordinate with Zone 7 on storm water release patterns to meet regional <br />flood control objectives. <br />2.3 Design subdivision improvements such as storm drain lines, streets, <br />curb-and-gutters, channels and culverts and open spaces in a <br />comprehensive manner such that no habitable buildings are subject to <br />flooding during a 100-year storm even[. <br />2.4 Investigate the feasibility of protecting the site from storm events larger <br />than the FEMA 100-year event, so long as such measures would not <br />place other existing development at increased flood risk. <br />2.5 Accommodate iii Pita>c I.~~I;~nnin~~ n..,"blc iiuurc flows from Sycamore <br />Creek coming through the adjoining Kaiser property in a new stream <br />course located along the base of the knoll ~in~ constructiuu iu 1'ha;e II of <br />SCHOOLS AND CAILD CARE OBJECTIVE: <br />TO ALLOW FOK SCHOOL AND CHILD CARE SITES AS NEEDED TO SERVE SPECIFIC PLAN <br />RESIDENTS AND TIIE SURROUNDING COMMUNITY. <br />School Policy 1: Elementary School. Designate an 11.2 acre site for a new <br />elementary school xs shown on the Land Use Diagram (Figure 3-I). The school <br />facility would serve elementary students from the Planning Area and may also <br />serve children from other areas of the City. <br />s-~ <br />