Laserfiche WebLink
uses. This compatibility extends from provision of joint-use infrastructure to basic land use <br />compatibility of adjoining uses. Although ::;~,e-, this Specific Plan covers otily the I'hasc <br />i private development land uses, its many policies and programs have been designed to mesh <br />with the future Phase II ]and use program. Most of the non-land use policies in the Specific <br />Plan are applicable to both Phases I and B. <br />ALTERNATIVE PRIVATE DEVELOPMENT AREAS <br />The private development areas have been selected to harmonize the joint goals of creating <br />functional, high qualiTy neighborhoods, allowing maximum flexibility in future Phase II land <br />uses, and satisfactorily resolving environmental constraints. The portion of the Eastern Area <br />slated for residential development contains areas over which other state and federal agencies <br />have jurisdiction. While the residential land use plan for the Eastern Area has been developed <br />to comply with these agencies' regulations, it is possible that, after further studies necessary to <br />receive all permits, the Eastern Area cannot be developed in a manner consistent with the land <br />use program set out for i[. In such an event, alternative locations for the residential <br />development component of I'~w~r I , d the Specific Plan have been identified. These <br />alternative areas will only be utilized for private development if the Eastern Area development <br />program is constrained or excluded from development due to , .~.., ....-rrestrictions In~u,ed <br />i~I~iCr~P'~P,;LLIIY_ p^Cn~C IIS, <br />DESCRIPTION AND LOCATION OF THE PLANNING AREA <br />As shown in Figure 1-], the SFWD site includes three separate land areas: a 202-acre Western <br />Arca between Interstate 680 (I-680) and the Arroyo de la Laguna; atriangular-shaped Central <br />Area of approximately 245 acres bounded by i-680 on [he southwest, Bernal Avenue on the <br />north, and by the Union Pacific Railroad (UPRR) right-of-way on the southeast; and an <br />Eastern Area of about 63 acres between the UPRR and the Alameda County Transportation <br />Corridor (formerly the SPRR rights-of-way). The Alameda County Transportation Corridor is <br />an undeveloped strip of land separating the SFWD Eastern Area from developed industrial land <br />along Sunol Boulevard. <br />Although the Planning Area is itself largely undeveloped, it lies within an urban setting that is <br />predominantly developed. As shown on Figure 1-2, the Planning Area is adjacent to <br />downtown and other urbanized portions of the City of Pleasanton, and it is located across from <br />the Alameda County Fairgrounds and [he Bernal Corporate Center on Bernal Avenue. Specific <br />land uses on neighboring properties include: <br />I-2 <br />