Laserfiche WebLink
Mitigation Monitoring and Reporting Rogram <br />VISUAL RESOURCES <br />N. Visual Resources <br />Page 104 ` <br />Mitigation Measure: N56. Reconstruction of Bernal Avenue shall maintain significant <br />existing street trees where possible. If any trees must he <br />removed to accommodate recoostructloa of the street, they shall <br />be replaced according to a plea for beautiTica[ion of Bernal <br />Avenue coosistent with the Community Character Element of <br />the Pleasanton General Plaa. <br />Impact to be Mitigated; A significant number of major trees on [he site would be lost as a result of <br />site grading and improvements to Bemal Avenue. <br />AgencyQndividual <br />Responsible for <br />Implementation: Site developer <br />Implemeotation Timing: During improvements [o Bema] Avenue <br />Mitigation Specifications: (1) Design improvements [o Bemal Avenue to preserve as many exist- <br />ing significant trees as possible, consistent with Mitigation Measure <br />J56 (design the signalized access points on Bemal Avenue so as to <br />maximize sigh[ distance and minimize damage to [he median trees). <br />(2) If any trees are removed, replace them consistent with the provisions <br />of the tree preservation requirements of PUD Condition 64. (3) <br />Implement the tree preservation requirements. <br />The PUD Development Plan limits removal of sycamore trees fmm Ber- <br />nal Avenue to [he minimum necessary for traffic improvements. PUD <br />Condition 64(b)(iv) requires replacement landscaping within 12 months of <br />removal for [hose trees removed in or along Bemal Avenue. <br />Ageucy/Individual <br />Responsible for <br />Monitoring: City of Pleasanton, Planning Department and Public Works Department <br />Monitor: Completion Date: Signature: <br />