My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program N. Visual Resources <br />Page 106 <br />VISUAL RESOURCES <br />Mitigation Measure: NSc. The site should be landscaped is a mauoer that replaces the tree <br />features lost as a consequence of development <br />Impact to be Mitigated: A significant number of major trees on the site would be lost as a result of <br />site grading and improvements to Bcma] Avenue. <br />Agency/Individual <br />Responsible for <br />Implemeatafion: Site developer <br />Impleroenta[ion Timing: As part of site prepazation <br />Mitigation Specifications: <br />PUD Conditions 64 and 65 provide for tree preservation, replacement <br />landscaping, and a overall Phase I Landscape Plan. These elements will <br />provide for [he replacement of tree features removed as part of the <br />development. <br />Agency/Individual <br />Responsible for <br />Monitoring: City of Pleasanton, Planning Department <br />Action by Monitor: (1) Review and approve the replacement landscaping plan and Phase I <br />Landscape Plan. <br />(2) Verify implementation of the plans. <br />Monitoring Timing: (1) Prior to approval of the mass site grading plan <br />(2) Upon completion of site grading, prior [o issuance of any subse- <br />quent approval or issuance of any permit <br />NOTE: IMPLEMENTATION OF THIS MEASURE CONSISTENT WITHTHEAUGUST, 2000 <br />SPECIFIC PLAN WILL NOT MITIGATE THIS /MPACT TO A LESS-THAN- <br />SIGNIFICANT LEVEL INALL LOCATIONS. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.