Laserfiche WebLink
Mitigation Monitoring and Repotting Program P. Public Health and Safety <br />- Page 117 <br />--- PUBLIC HEALTH AND SAFETY <br />Mitigation Messure: Plb. Remediate hazardous conditions (it found). <br />_. Impact to be Mitigated: Introduction of residents and workers into an area affected by existing con- <br /> tamination (if any) which constimtes a significant threat to public health and <br /> safety. <br />Agency/Individual <br />Responsible Tor <br />Implementation: Site developer <br />Implementation Timing: Prior to mass site grading <br />Mitigation Specifications: If' the available environmental smdies indicate the presence of <br /> contamination exceeding statutory requirements which constimtes a <br /> significant threat to public health and safety, prepare and implement soils <br />-- and/or groundwater remediation plans [o address conditions which <br /> constitute a significant threat to public health and safety identified in [he <br /> available environmental studies . <br /> The remediation plans shall be submitted to the appropriate regulatory <br /> agencies (e.g., Alameda County Health Services Department, reporting to <br /> the State Department of Toxic Substance Control, and the San Francisco <br /> Regional Water Quality Control Board). <br /> Remedia[ion measures shall be carried out consistent with the remediation <br /> plans. <br />- Agency/Individual <br />Responsible for <br />Monitoring: City of Pleasanton, Planning Department <br />Ac[ioo by Monitor: (1) Review available environmental studies. <br /> (2) Verify that remediation measures have been carried out consistent <br />- with [he remediation plans. <br />Monitoring Timing: (1) Prior to issuance of a grading permit or any other development per- <br /> mit for the site <br /> (2) Prior to issuance of a grading permit or any other development per- <br /> mit for the site <br />Monitor: Completion Date: Signature: <br />