Laserfiche WebLink
Mitigation Measures Not Applicable to the Phaze I Alternatives <br />Page 122 <br />INFRASTRUCTURE SYSTEMS: WASTEWATER <br />Mitigation DIa. Relocate main and pump station, if necessary for this project, to a site providing <br />satisfactory access, with no disruption of existing flows during the relocation <br />process. <br />Nate: Phase !does War propose any developmen! in the area of the sewer main <br />and pump station. <br />Mitigation DIb. Follow best available practices for either abandoning the main and pump station <br />in place or removing [hem in order to minimize health hazazds. <br />See Wore to Measure Dl a. <br />PUBLIC SERVICES: EDUCATION <br />Mitigation Elb. Project sponsor shall seek agreement with PUSD, and City shall urge PUSD, to <br /> build a new elementary school that provides, at a minimum, [he core facilities and <br /> classrooms required to serve a student population of 300 so that project elemen- <br /> tary students do not cause enrollment at then-existing elementary schools to <br /> exceed their ideal capacities, using the site dedicated by [he project and the <br /> impact fees paid as development occurs. <br /> Note: Schaal is currently under construction. <br />Mitigation Eta. Prior to adoption of the development agreement for the area, reserve afive-[o-ten <br /> acre site for an elementary school. <br /> See note to Measure EI h. <br />Mitigation E2b. In order to facilitate early development of the school, grant the school site to the <br /> Pleasanton Unified School District, when requested by the District, in graded, devel- <br /> opable condition, in exchange for a credit toward future school fees. <br /> See note to Measure Elb. <br />Mitigation Etc. Projecl sponsor shall seek agreement with PUSD, and City shall urge PUSD, m <br /> build a new elementary school that provides, at a minimum, the core facilities and <br /> classrooms required to serve a student population of 300 so [hat so the school is <br /> operational when the number of elementary school students living in the project <br /> area reaches 300, using [he site dedicated by [he project and [he impact fees paid <br /> as development occurs. <br /> See Hate to Measure EI b. <br />Mitigation E2d. Build infrastructure to serve [he school site in a timely manner. <br /> Note: The schanl currently under consfruction is located on a site adjacent m <br /> Case Avenue where infrastructure was already available. <br />