My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program L. Noise <br />Page Si <br />NOISE <br />Mitigation Measure: L36. Design the community park so that uses that benefit most from <br />noise levels in the'°normally acceptable" raege are located in <br />the portions of the park where noise exposure is lower than 65 <br />dB. <br />Impact to be Mitigated: Portions of the proposed community park (on the Central Parcel) adjacent <br /> [o Bemal Avenue would be exposed [o noise levels in excess of a Ldn of <br /> 65 dB. <br />'~ Ageucy/Iudividual <br />2esponsible for <br />Implementation: Developer of the community park <br />Implementation Timing: During design and construction of the park <br />- Mitigation Specifications: The Specific Plan does not provide a Community Park in Phase I. <br /> If such a park is included in [he uses of the City-owned lands on the Cen- <br /> tral Parcel (Parccl 14) planned in Phase II, [he park should he designed <br /> such that activities that benefit most from "normally acceptable" noise <br /> levels are located farthest from I-680. <br />Agency/Iudividual <br />Responsible for <br />Monitoring: Cit, <br />Action by Monitor: (1) <br />(2) <br />Monitoring Timing. (1) <br />(2) <br />~ of Pleasanton, Parks and Community Services Department <br />Review and approve design for [he community park [o assure that <br />the arrangement of uses recognizes the expected noise Icvels in dif- <br />ferent locations. <br />Verify that pazk is built as approved. <br />Prior to approval of a development plan for the park <br />Verify that park is built as approved. <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.