Laserfiche WebLink
Mitigation Monitoring and Reporting Program L. Noise <br />Page 85 <br />NOISE <br />Mitigatim Measure: L4. Locate the fire statiou farther from, or io au area not surv <br />'~, roaaded by, residential or other noise sensitive uses. <br />Impact to be Mitigated: Noise levels generated by the proposed fire station would be significant a[ <br /> noise sensitive receptors. <br />Agency/Individual <br />Responsible for <br />Implementation: City of Pleasanton <br />Implementation Timing: Prior [o adoption of [he Specific Plan <br />Mitigation Specifications: The August, 2000 Specific Plan relocates the fire smtion site to Bernal <br /> Avenue (Parcel 13), as shown more particularly in the PUD Plan Phase I <br /> Land Use Diagram. <br /> PUD Condition 18 provides for adesign-review process for the fire <br /> station site. This process may incorporate [he integration of noise <br /> mitigating measures such as: siting the building to place the bulk of the <br /> structure between the fire engine area and the homes, constructing a solid <br /> wall at the reaz property line, and incorporating building materials which <br /> dampen noise emanating from the interior of [he fire station. <br /> The Fire Department also implements operational procedures to minimize <br /> noise in residential areas, such a delaying the use of sirens, and creating <br /> traffic breaks for exiting by way of traffic signal override (instead of <br /> sirens). <br />Agency/Individual <br />Responsible for <br />Monitoring: City of Pleasanton, Planning Department <br />Action by Monitor: (1) Verify that the fire station site designated in the August, 2000 Specific <br /> Plan is incorporated in the adopted Specific Plan. <br /> (2) Verify [ha[ noise mitigation measures have been incorporated into the <br /> design of the fire station. <br /> (3) Verify [ha[ noise mitigating operational procedures are being <br /> implemented. <br />Monitoring Timing: (1) Prior to adoption of the Specific Plan <br /> (2) Prior [o adoption ofdesign-review for f-ire station <br /> (3) Ongoing after occupancy of the firc station <br />Monitor: Completion Date: Signature: <br />