My WebLink
|
Help
|
About
|
Sign Out
RES 00114A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2000
>
RES 00114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2008 11:33:51 AM
Creation date
9/11/2000 11:07:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/21/2000
DOCUMENT NO
RES 00114A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program M. Cultural Resources <br />Page 89 <br />CULTURAL RESOURCES <br />Mitigation Measure: Mla Prior to approval of any gading or developmeat plans, <br />including infrastructure plans, complete au intensive enltnnl <br />resources survey of the study area. <br />Impart to be Mitigated: Potential for future development of the study area to disturb culNral <br />resources not yet identified. <br />Agency/Individual <br />_ Responsible for <br />Implementation: Site developer <br />implementation Timing: Prior to mass site grading <br />Mitigation Specifications: In order to more accurately assess the potential impact of any future <br />development of the area, the entire parcel shall be subject to a cultural <br />resource survey [o identify any su~cial indicators of historic and <br />prehistoric sites within the project area as required by PUD Condition 41. <br />The archaeologist shall submit to the City a report documenting the <br />_ findings of the survey. Any cultural resources identified as a result of the <br />survey would be subject to mitigation as described under M2. <br />Agency/Individual <br />Responsible for <br />Monitoring: City of Pleasan[oq Planning Department <br />Action by Monitor: (1) Verify that a qualified archaeologist has been hired. <br />(2) Review and approve [he archaeologisPs report. <br />(3) If mitigation is required, verify that Measure M2 is implemented. <br />Monitoring Timing: Prior to issuance of a permit for mass site grading <br />Monitor: Completion Date: Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.