My WebLink
|
Help
|
About
|
Sign Out
RES 01063
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2001
>
RES 01063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2001 11:41:59 PM
Creation date
7/20/2001 8:45:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/5/2001
DOCUMENT NO
RES 01063
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0. <br /> <br />81. <br /> <br />to October 15 and once in January. Additional cleaning may be required if found <br />nec~sary by the City Engineer/Director of Building Impection. <br /> <br />The project developer shall include erosion control/storm water quality measures in the <br />final grading plan which shall specifically address measures to prevent soil, dirt, and · <br />debris from entering the storm drain system. Such measures may include; but are not <br />limited to, hydroseeding, hay bales, sandbags, and siltation fences and are subject to the <br />review and approval of the City Engineer/Director of Building Inspection. If no grading <br />plan is required, necessary erosion control/storm water quality measures shall be shown <br />on the site plan submitted for an on-site permit, subject to the review and approval of <br />the Director of Building Inspection. The project developer is responsible for ensuring <br />that the contractor is aware of and implements such measures. <br /> <br />The project developer is responsible for implementing the following measures during all <br />construction phases of the subject project: <br /> <br />a. Gather all construction debris on a regular basis and place them in a dumpster or <br /> other container which is emptied or removed on a weekly basis. When <br /> appropriate, use tarps on the ground to collect fallen debris or splatters that could <br /> contribute to storm water pollution. <br />b. Remove all din, gravel, rubbish, refuse, and green waste from the street pavement, <br /> and storm drains adjoining the project site. During wet weather avoid driving <br /> vehicles off paved areas. <br />c. Broom sweep the public street pavement adjoining the project site on a daily basis. <br /> Caked-on mud or dirt shall be scraped from these areas before sweeping. <br />d. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or dirt <br /> flowing into the City storm drain system. Filter materials shall be maintained <br /> and/or replaced as necessary to ensure effectiveness and to prevent street flooding. <br /> Dispose of falter particles in the trash. <br />e. Create a contained and covered area on the site for the storage of bags, cement, <br /> paints, flammable, oils, fertilizers, pesticides, or any other materials used on the <br /> project site that have the potential for being discharged to the storm drain system <br /> through being windblown or in the event of a material spill. <br />f. Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br /> gutter, or storm drain. <br />g.. Ensure that concrete/gunite supply trucks or concrete/plasterers operations do not <br /> discharge wash water into street gutters or drains. <br />h. Construction access routes shall be limited to those approved by the City Engineer <br /> or Building Inspector and shall be shown on the approved grading plan. <br /> <br />PUDD 81-$0-84D Conditions of Approval Page 12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.