Laserfiche WebLink
Mr. Brian Swift <br />May 16, 2001 <br />Pa~e 4.of 11 <br /> <br />will be a problem for everyone involved. As described above, most residential projects <br />located on a busy street have sound w~i~ with §ack yards of the houses facing the street. <br />In the cases where there isn't a sound wall, the homes are physically separated from the <br />bu~ street by a separate parallel frontage street for residential use. The homes that front <br />Hopyatd Road south of the Gene's grocery'store ate a good example of this later <br />situation. Neither sound walls nor a separate street could be provided on our property, <br />and without either of them, residential on the comer of. a busy street is unsafe for the <br />occupants and their children. Meanwhile, dealing with the noise coming from Hopyard <br />Road and Gibraltar will make the cost of construction more expensive, and pollution <br />from vehicular exhaust cannot even be dealt with in a practical way. <br /> <br />Economic Feasibility <br /> <br />We have researched the feasibility of housing on our property by consulting with two <br />firms in the business of developing multi-family housing. As a result of this research, we <br />have concluded that, in addition to being a poor location for housing, housing on the site <br />is not economicully feasible or sensible. <br /> <br />Archstone Communities is a for-profit developer. Bridge Housing is an established non- <br />profit affordable housing sponsor. Both firn~ have developed projects in Pleasanton and <br />are well respected in the Bay Area community. Each firm looked at different housing <br />scenarios based on their expertise, and both used $4,500,000 as the cost of the property, <br />which is what we paid to purchase it. This amount does not include our costs to hold the <br />property for the year that we've owned it, and it does not include the amounts we <br />expended designing our project and processing approvals. This amount also does not <br />include any profit or return to us as owners of the property. <br /> <br />Arohstone Communities evaluated the feasibility of doing market rate apartments on the <br />site with 15% of the units being affordable units per Pleasanton's inelusinnary zoning <br />ordinance. After developing a full project cost budget and cash flow analysis, they <br />concluded that they could not achieve the yields necessary to make the project feasible. <br />The primary reasons for its unfeasibility are the high cost of the land and the high cost of <br />constructing the type of structure (podium building) that would be required on this site. <br />They were not able to make it "pencil" despite using market rents which are still <br />extremely high compared to just a few years ago. We also have concerns about whether <br />market rents would be possible given the undesirable location. <br /> <br />After looking at the specific characteristics of the site, Archstone Communities decided <br />on a highly dense project with 130 total units in a four story podium building over <br />parking (in essence a five story building with parking being the first floor). This density <br />is equivalent to 48 dwelling units to the acre, which is nearly twice as dense as any other <br />project in Pleasanton. Of the 130 units, 15%, or 19 units, were assumed to be affordable <br />units, with 13 units affordable to low income occupants and 6 units affordable to very <br />iow income occupants. <br /> <br /> <br />