Laserfiche WebLink
f.) Never clean machinery, tools, brushes, etc., or rinse containers into a <br />street, gutter, or storm drain. <br /> <br />g.) Ensure that concrete/gunite supply tracks or concrete/plasterers <br />operations do not discharge wash water into street gutters or drains. <br /> <br />h.) Consu'uction access routes shall be limited to those approved by the <br />City Engineer or Building Inspector and shall be shown on the approved <br />grading plan. <br /> <br />35. The applicant shall label all on-site storm drain inlets with the wording, <br /> "No Dumping -- Drains to Bay" using City-approved methods and <br /> materials. On-site storm drain facilities shall be cleaned a minimum of <br /> twice a year as follows: immediately prior to October 15 and once in <br /> January. Additional cleaning may be required if found necessary by the <br /> City Engineer/Director of Building Inspection. <br /> <br />[end] <br /> <br /> <br />