Laserfiche WebLink
NILES - PLEASANTON TRACK CONSOLIDATION PROJECT <br />work for the underpass structure identified in paragraph 1 above, and for the <br />CITY's portion of the project as set forth in paragraph 4 of SECTION I hereof as <br />so authorized by CITY. <br />4. Eliminate the following listed public grade crossings across tracks and <br />rights -of -way of the SPTC upon the abandonment and removal of existing railroad <br />tracks, and restore roadway pavements and any appurtenant facilities following <br />removal of said railroad tracks: <br />a. Kilkare Road, Sunol, CPUC Crossing No. D -35.6. <br />b. Bond Street, Sunol, CPUC Crossing No. D -35.8. <br />c. Pleasanton -Sunol Road, CPUC Crossing No. D -38.3. <br />5. Cause the preparation of plans and specifications, prepare contract <br />documents, advertise for bids and award a construction contract, provide construc- <br />tion engineering, and certify the completed work for the realignment and recon- <br />struction of the portion of Pleasanton -Sunol Road at CPUC Crossing No. D -38.3 <br />following abandonment and removal of existing railroad tracks in order to <br />eliminate certain sharp reverse curve approaches thereto. <br />6. Remove the existing superstructure at CPUC Crossing No. 4- 37.2 -B on the <br />Pleasanton -Sunol Road upon completion of the new underpass structure and appurtenant <br />approaches covered in paragraph 1 above, and restore the roadway in an appropriate <br />manner. <br />7. Maintain all roadway portions of the project as constructed within the <br />unincorporated area of COUNTY, and make no claims against CITY at any time for any <br />portion of such maintenance expense. <br />8. Place CITY's deposit required to be made by paragraph 5 of SECTION I above <br />in an interest bearing trust account, with the interest derived therefrom to be credited <br />at the end of each quarter to the aforesaid trust account. Withdrawals of the deposited <br />amount and accumulated interest from the aforesaid interest - bearing trust account will <br />be made as necessary to cover payment for CITY's portion of the project. <br />9. Upon completion and acceptance by COUNTY of COUNTY's construction contract <br />for the project improvements noted above, to furnish CITY with a detailed statement <br />of costs to be borne by both CITY and COUNTY, and to refund to CITY any amount of <br />CITY's deposited funds remaining after total costs to be borne by CITY have been <br />deducted. <br />4 <br />