Laserfiche WebLink
Growth Limitation <br /> Policies <br /> Table 2 -9 <br /> Roadway Level of Service Standards <br /> Roadway Standard <br /> 1. Residential local: Streets and Level of Service "B" <br /> intersections (v /c 0.60 0.69)* <br /> 2. Collectors: Streets and Level of Service "D" <br /> intersections (v /c 0.80 -0.84) <br /> 3. Arterials: Streets and intersections Level of Service "D" <br /> (v /c 0.85 -0.89) <br /> 4. Regional Corridors: Streets and Existing volume to capacity ratio. <br /> intersections on Ygnacio Valley Must meet Action Plan requirements, <br /> Road, Treat Boulevard and Pleasant when adopted. <br /> 0 Hill Road <br /> 5. Core Area Roadways and Level of Service "E" <br /> Intersections (bound by 1 -680, (v /c 0.90 -0.94) <br /> Southern Pacific Right -of -Way and <br /> Walden Road) <br /> Regional Corridors defined above shall coincide with Measure C defined "Routes of Regional <br /> Significance." Action Plans will be developed by TRANSPAC for the intersections on these <br /> roadways. These Action Plans will be submitted for approval and implementation by the City <br /> and other responsible jurisdictions. <br /> (Refer to the Roadways Subelement of the Transportation Element for additional information <br /> on roadway capacities and levels of service.) <br /> *Volume to capacity ratio <br /> *As of September 1, 1993 <br /> 2 -84 <br />