Laserfiche WebLink
168 <br />haven't been operating. <br />Mr. Oxsen will advise the City of Chico that the Town of Pleasanton intends to use their <br />money in the Chaper 47 Fund account in Sacramento; therefore, we will be unable to assign <br />said monies to the City of Chico. <br />COMMITTEE REPORTS: <br />POLICE DEPARTT':ENT: <br />Councilman Hewitson reported he and Chief of Police Delucchi had made a survey of the One <br />Way signs and the inability to see same on Division Street, on both Railroad Avenue and <br />St. Mary Street. He suggested that No Right Turn and No Left Turn signs be placed on <br />Railroad Avenue at the entrance to Division Street and a double white line be painted <br />on St. Mary Street to eliminate anyone making a left hand turn onto Division Street. It <br />was the opinion that both situations should be surveyed again to be sure that the above <br />suggestions would be the best solutions to the problem. <br />PUBLIC UTILITIES: <br />Mr. Oxsen was directed to contact,Mr. H. J. Deetz in order to have him lower the concrete <br />blocks, on the bank by the Slope Wall, into the Creek, which will in time fill in and <br />provide additional protection against the bank washing away during the heavy rains. <br />Mr. Oxsen stated that Mr. John McWilliams had liven an estimate of $297.00 for erecting <br />a wing wall to prevent the water in the creek from cutting the bank and undermining the <br />sidewalk adjacent to the culvert on Kottinger Avenue. Mr. Al Avilla will give his esti- <br />mate on same in a few days. <br />The Council directed Mr. Oxsen to write Firma, Inc. regarding their failure to correct <br />certain conditions that they had agreed to upon our acceptance of Amaral Circle as being <br />completed. To date, they have failed to do so. A copy of this letter is to be sent to <br />Mr. J. J. Amaral. <br />Allen Riedeman have not as yet finished paving the street <br />hazardous condition of Vineyard Avenue still exists. <br />Mayor Trimingham will contact Mr. Stahlnecker tomorrow to <br />he desires for an easement across his property. <br />It was reported that Western Pacific Co. are progressing well on their installation of <br />an additional culvert under their main track to take care of flood waters southwesterly <br />from the Town of Pleasanton. They have the tunnel in and will be ready soon to put the <br />pipe under. <br />STREETS AND BUILDINGS: <br />in their tract; therefore, the <br />ascertain what consideration <br />Mr. Vibreth, of the Alameda County Flood Control office, will establish grade on ditch <br />between the Southern Pacific and Wastern Pacific Railroads. <br />Mr. Oxsen reported that he had contacted Mr. Burgess, of the Kaiser Bonding Co., San <br />Francisco, regarding the issuance of revenue bonds. It was Mr. Burgess' opinion that it <br />would be difficult to sell the bonds to increase present water storage facilities, and in <br />turn referred Mr. Oxsen to Mr. Harrington, of Orrick, Dahlquist, Neff and Harrington <br />attorneys for further advice,: After much discussion of the matter, the Council thought <br />it best to call for a general bond issue for construction of 2,000,000 gallon reservoir. <br />Estimated cost of a 2,000,000 gallon reservoir is $4,000.00 plus engineering costs; <br />however, it was believed that a bond issue of $110,000.00 would be best as it would help <br />to finance the drilling of a new well. Mr. Oxsen was requested to contact Mr. John <br />Mancini, Mr. W. B. Boggs, and the Sanitary Engineer, of the East Bay Municipal Utilities <br />District, for their recommendation of Mr. Layton, Civil Engineer. <br />In Engineer Goodridge's correspondence with the County of Alameda, it was learned that <br />the County plans to raise the Pleasanton Sunol Road an additional 8" to 12 Mr. Oxsen <br />was asked to write to Mr. W. B. Boggs, County Surveyor, and Mr. Chester Stanley, Super- <br />visor, thanking them for their co- operation in the reconstruction of the Pleasanton <br />Sunol Road. <br />Mayor Trimingham reported that Mr. Americo Zaro had requested permission to move the <br />fence closer to McKinley Park to give him additiontgrazing land for his cattle. The <br />Council agreed to grant his request under the supervision of Mr. Sobiela and the <br />condition that he also fix the fence. <br />Mr. Oxsen reported that he has been unable to contact Mr. Batten regarding the installation <br />of curbs and gutters on the corner of Angela and Augustine Streets; however, Mr. Oxsen <br />spoke with the carpenters who are building for Mr. Batten on said corner, and it was <br />their belief that it was Mr. Batten's intention to put in curbs and gutters. <br />