My WebLink
|
Help
|
About
|
Sign Out
JUN 1946 TO JUL 1950
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
DEC 1923 TO MAY 1954
>
JUN 1946 TO JUL 1950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2012 3:40:27 PM
Creation date
9/8/2009 4:17:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
6/3/1946
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
160 <br />Divided as•Tollows: <br />General Fund <br />1910 Bond Fund <br />1929 Bond Fund <br />Music & Promotion Fund <br />Library Fund <br />1948 Sewer Bond Fund <br />Balances in Special Funds <br />Water Deposit Fund <br />Special Gas Tax Fund <br />1948 Sewer Bond Const. Fund <br />$24,384.67 <br />1,210.40 <br />1,765.01 <br />135.'76 <br />989.69 <br />5,616.23 <br />$ 287.00 <br />10;026.04 <br />122,607.44 <br />CHIEF OF POLICE REPORTED collections as follows: <br />Water Bills fi 1, 785.60 <br />Licenses 236.00 <br />IvIlik Inspection Fees 27.58 <br />TREASURER REPORTED Cash Balances as follows: <br />General Fund <br />Special Gas Tax Fund <br />1948 Sewer Bond Fund <br />Water Deposit Fund <br />WATER DEPARTMENT REPORTED: <br />$34,101.50 • <br />10,026.04' <br />122,607.94 • <br />287.00 <br />New Work: Repaired and replaced 9 g" meters. <br />Repaired 3 fire hydrants: 1 on Neal St., 1 on <br />Rose Ave., 1 on Main St. <br />Service on Rose Ave. - New Service <br />4" " " Pleasanton Ave. <br />Repaired Reservoirs. <br />Gross Incofne <br />Expense <br />Net Income <br />$1,787.60 <br />944.11 <br />$ 843.49 <br />Pumping Hours - 196 Hours <br />Water Pumped - 7,232,400 gals. <br />Water Level -Black Ave. - 63.00' <br />" If -Town Well - 84.20'` <br />Rainfall to date 8.19" - Normal 13.14" <br />Loss on Sunol Pipe - None <br />Sewer System Expense - $132.00 <br />BUILDING INSPECTOR reported: <br />3 Permitsissued for a total estimated construction cost <br />of $8,100.00. <br />Fees Collected $21.40. <br />SUPT OF STREETS reported: <br />Salaries and Wages <br />Materials and Supplies <br />Total Expense <br />$510.00 <br />473.55 <br />$983.55 <br />CITY JUDGE reported: <br />Fines and forfeited bail collected: $100.00. <br />FIRE CHIEF reported: <br />2 Fires - 0 in Town, 2 out of Town. <br />MILK INSPECTOR reported: <br />15 Samples Tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.