Laserfiche WebLink
1 -580 FALLON ROAD I/C MODIFICATIONS CCS Planning and Engineering <br /> EA No. 04257- 257601 COMBINED DATE: March 6, 2003 <br /> BID <br /> ITEM UNIT OF ESTIMATED UNIT <br /> No. No. BID ITEM DESCRIPTION MEASURE QUANTITY PRICE AMOUNT <br /> 155 (S) 850113 PAVEMENT MARKER (RETROLEFLECTIVE -TYPE H) EA 375 4.00 1,500 <br /> 156 (S) 860298 SIGNAL AND LIGHTING (STAGE CONSTRUCTION) (LOCATION 1) LS 30,000.00 <br /> 0 9 SIGNAL AND LIGHTING (STAGE CONSTRUCTION) (LOCATION 2) LS 34,800.00 <br /> 157 (S) 860299 <br /> 158 (S) 860402 LIGHTING (CITY STREET) LS 1 20,000.00 20,000 <br /> 159 (S) 860415 LIGHTING (STAGE CONSTRUCTION) LS 35,000.00 <br /> 860460 LIGHTING AND SIGN ILLUMINATION LS 1 120,000.00 120,000 <br /> 161 S 860980A TRAFFIC OPERATION SYSTEM CCTV LS 1 80,000.00 80,000 <br /> 162 (5)' 861101 RAMP METERING SYSTEM LOCATION 1 LS 4 80,000.00 320,000 <br /> 163 (S)1 861102 RAMP METERING SYSTEM (LOCATION 2) 4 LS 91,000.00 <br /> TRAFFIC SIGNALS LS 1 280,000.00 280,000 <br /> 164 (5)861497 SIGNAL AND LIGHTING (MODIFY) (LOCATION 1) LS 162,000.00 <br /> 165, (S) j 861498 SIGNAL AND LIGHTING MODIFY LOCATION 2) LS 170,000.00 <br /> 999990 MOBILIZATION LS 1 493,000.00 493,000 <br /> SUBTOTAL BID ITEMS: 5,413,958 <br /> CONTINGENCY T TOTAL PROJECT CONSTRUCTION WORK 812,094 <br /> I SUPPLEMENTAL (5 %)I 270,698 <br /> COST 6,496,750 <br /> File: p: \98104pse\Excel \Cost Estimate \65 %Cost Estimatc\I3EES REV2 PAGE 6 OF 6 <br />