Laserfiche WebLink
=La ccs <br /> 1 PLANNING AND ENGINEERING <br /> 11" I N 0 O R P 0 R A T E 0 <br /> CCS Project #98104 6 Crow Canyon Court <br /> San Ramon, California 94583 -1621 <br /> 925/314 -1220 Fax 925/314 -1229 <br /> March 6, 2003 email: SRO @ccsoffice.com <br /> Mr. Ferd Del Rosario Mr. Eric Cordoba <br /> City of Dublin Cordoba Consulting, Inc. <br /> 100 Civic Plaza 5368 Laurel Drive <br /> Dublin, CA 94568 Concord, CA 94521 <br /> Subject: I -580 /Fallon Road Interchange <br /> Additional Scope of Work/Design Costs Request No. 3 <br /> Gentlemen: <br /> As requested at our status meeting on October 17, 2002, the CCS Design Team has summarized the <br /> significant additional design, geotechnical and management activities required to complete the <br /> contract plans for the I- 580/Fallon Road interchange project. These additional activities represent <br /> engineering and geotechnical effort that was not included in the original contract scope of work and <br /> Amendments No. 1 and No. 2 for this project. In addition, at our PDT meeting with Caltrans on <br /> December 13, 2002, Caltrans had raised the issue of processing this project through federal <br /> requirements since this project will introduce two additional access points onto I -580. We are also <br /> requesting Engineering Services during Construction which was requested previously but has not <br /> received confirmation. <br /> Each additional management, engineering, geotechnical, environmental, traffic, and construction <br /> support service activity is described and a corresponding cost identified within the text of the <br /> "Additional Scope of Work No. 3" attachment. A cost breakdown by activity and team firm is <br /> presented on the accompanying spreadsheet. <br /> Part of these cost increases for the I- 580/Fallon Road Interchange Project are related to the additional <br /> northbound to westbound loop as requested by City of Pleasanton, and the design schedule delay <br /> associated with the additional loop. As you know, the additional traffic study, Geometrics Approval <br /> Drawings, environmental updates, and revision to the PSR/PR due to the addition of this NB/WB <br /> loop are covered in our Amendment No. 2 request, this amendment is for design effort to complete <br /> the contract plans. <br /> The fee proposal prepared in April 2000 anticipated that final design would be completed by early <br /> 2001. Due to the extension of the design phase, this request is to update the hourly rates to the <br /> current 2003 rates. The new rates to begin in January 2003. <br /> We are also requesting to include Engineering Services during Construction into this amendment. <br /> In March 2001, City of Dublin had requested CCS to prepare scope and budget for this activity since <br /> Construction Support Services is not included in the original scope of work. CCS prepared and <br /> submitted the information to City on March 23, 2001 but has not been submitted as an amendment. <br /> Since this project now includes City of Pleasanton funding portion of design and construction, the <br /> attached spreadsheets include segregated City of Dublin's share and City of Pleasanton's share. The <br /> EXHIBIT "A" OF FUNDING AGREEMENT <br /> P:9Rll 4PS6 dmin FallonPS &L cop inP- FecsAP S 6Umendment No.3- 030003.doc <br /> T R A NS P O R T n T I O N 0 i V I L ITS <br />