My WebLink
|
Help
|
About
|
Sign Out
DUBLIN SAN RAMON SERVICES PHASE OUT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
D
>
DUBLIN SAN RAMON SERVICES PHASE OUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2015 1:32:47 PM
Creation date
12/4/2009 10:42:50 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
5/30/1978
LONG TERM AGREEMENTS - NAME
DUBLIN SAN RAMON SERVICES PHASE OUT
LONG TERM AGREEMENTS - TYPE
WATER SERVICES AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
AMENDMENTS ALSO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agreement of City. The costs thereof shall not be considered as <br /> capital expenses and shall not be funded from the basic connection fee. <br /> The $50,000 limit referred to in this section shall be updated annually <br /> in accordance with the most current EPA Construction Cost Index for <br /> Sewage Plant Construction, San Francisco Bay Area. <br /> SECTION 14. FINANCES. <br /> 1. Connection Fees. <br /> From and after the effective date of this Agreement, a basic <br /> connection fee, or equivalent charge for sewerage services shall be <br /> levied and collected in the total service area of the District's Plant <br /> pursuant to this section and subject to the limitations contained in <br /> paragraph 3.b. following. Nothing contained herein shall preclude either <br /> party from levying or retaining an additional, or surcharge, fee over <br /> the basic connection fee for properties developing within areas served <br /> by their respective sewage collection systems. <br /> a. The basic connection fee for similar uses shall be uniform <br /> throughout the combined service area identified in Section 6. <br /> b. Funds derived from the basic connection fee, or any accumula- <br /> tions thereof, shall be used only for planning, design and construction <br /> of facilities necessary to increase plant capacity; or for modifications, <br /> improvements, additions and replacements in accordance with the pro- <br /> visions of Section 13. <br /> c. District, in consultation with City, shall determine the <br /> dollar amount of the basic connection fee based upon the anticipated <br /> future needs of the parties. <br /> d. City shall collect the basic connection fee for projects <br /> developing in the combined service area served by City's sewage <br /> -20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.