My WebLink
|
Help
|
About
|
Sign Out
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
R
>
RIDGE VIEW COMMONS
>
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:55:16 PM
Creation date
1/13/2010 2:35:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/27/1988
LONG TERM AGREEMENTS - NAME
RIDGE VIEW COMMONS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terms and Conditions of Agreement Between Owner and Architect <br />ARTICLE 1 <br />ARCHITECT'S SERVICES <br />AND RESPONSIBILITIES <br />The Architect's Basic Services are as described <br />under the four Phases Identified below and in <br />Article 10, and unless otherwise provided in Article <br />10 include normal structural, mechanical and elec- <br />trical engineering services. <br />1.1 DESIGN PHASE <br />1.1.1 The Architect shall review with the Owner alterna- <br />tive approaches to design and construction of the Project. <br />1.1.2 Based on the mutually accepted program, the Ar- <br />chitect shall prepare, for approval by the Owner, Design <br />Documents consisting of drawings and other documents <br />appropriate for the Project. <br />1.2 CONSTRUCTION DOCUMENTS PHASE <br />1.2.1 Based on the approved Design Documents, the <br />Architect shall prepare, for approval by the Owner, Con- <br />struction Documents consisting of Drawings and Specifi- <br />cations setting forth in detail the requirements for the <br />construction of the Project. <br />1.2.2 The Architect shall assist the Owner in connection <br />with the Owner's responsibility for filing documents re- <br />quired for the approval of governmental authorities hav- <br />ing jurisdiction over the Project. <br />1.3 BIDDING OR NEGOTIATION PHASE <br />1.3.1 Unless provided in Article 10, the Architect, fol- <br />lowing the Owner's approval of the Construction Docu- <br />ments, shall assist the Owner in obtaining bids or nego- <br />tiated proposals and in awarding contracts for construc- <br />tion. <br />1.4 CONSTRUCTION PHASE— ADMINISTRATION OF THE <br />CONSTRUCTION CONTRACT <br />1.4.1 The Construction Phase will commence with the <br />award of the Contract for Construction and will terminate <br />when final payment to the Contractor is due, or in the <br />absence of a final Certificate for Payment or of such due <br />date, sixty days after the Date of Substantial Completion <br />of the Work, whichever occurs first. <br />1.4.2 Unless otherwise provided in this Agreement and <br />incorporated in the Contract Documents, the Architect <br />shall provide administration of the Contract for Construc- <br />tion as set forth below and in the edition of AIA Docu- <br />ment A201, General Conditions of the Contract for Con- <br />struction, current as of the date of this Agreement. <br />1.4.3 The Architect shall be a representative of the <br />Owner during the Construction Phase. Instructions to <br />the Contractor shall be forwarded through the Architect. <br />1.4.4 The Architect shall visit the site at intervals appro- <br />priate to the stage of construction or as otherwise agreed <br />by the Architect in writing to become generally familiar <br />with the progress and quality of the Work and to deter- <br />mine in general if the Work is proceeding in accordance <br />AIA DOCUMENT 8181 • OWNER.ARCHITECT AGREEMENT FOR HOUSING SERVICES • IUNE 1978 EDITION • AIAa <br />© 1978 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE. N.W.. WASHINGTON. D.C. 20006 <br />with the Contract Documents. However, the Architect <br />shall not be required to make exhaustive or continuous <br />on -site inspections to check the quality or quantity of the <br />Work. On the basis of such on -site observations as an <br />architect, the Architect shall keep the Owner informed of <br />the progress and quality of the Work, and shall endeavor <br />to guard the Owner against defects and deficiencies in the <br />Work of the Contractor. <br />1.4.5 The Architect shall not have control or charge of <br />and shall not be responsible for construction means, <br />methods, techniques, sequences or procedures, or for <br />safety precautions and programs in connection with the <br />Work, for the acts or omissions of the Contractor, Sub- <br />contractors or any other persons performing any of the <br />Work, or for the failure of any of them to carry out the <br />Work in accordance with the Contract Documents. <br />1.4.6 The Architect shall at all times have access to the <br />Work wherever it is in preparation and progress. <br />1.4.7 The Architect shall determine the amounts owing <br />to the Contractor based on observations at the site and <br />on evaluations of the Contractor's Applications for Pay- <br />ment, and shall issue Certificates for Payment in such <br />amounts. <br />1.4.8 The issuance of a Certificate for Payment shall <br />constitute a representation by the Architect to the Owner, <br />based on the Architect's observations at the site as pro- <br />vided in Subparagraph 1.4.4 and on the data comprising <br />the Contractor's Application for Payment, that, to the best <br />of the Architect's knowledge, information and belief, the <br />Work has progressed to the point indicated; the quality of <br />the Work is in accordance with the Contract Documents <br />(subject to an evaluation of the Work for conformance <br />with the Contract Documents upon Substantial Com- <br />pletion, to the results of any subsequent tests required by <br />or performed under the Contract Documents, to minor <br />deviations from the Contract Documents correctable prior <br />to completion, and to any specific qualifications stated in <br />the Certificate for Payment); and that the Contractor is <br />entitled to payment in the amount certified. However, the <br />issuance of a Certificate for Payment shall not be a repre- <br />sentation that the Architect has made any examination to <br />ascertain how and for what purpose the Contractor has <br />used the moneys paid on account of the Contract Sum. <br />1.4.9 The Architect shall be the interpreter of the re- <br />quirements of the Contract Documents and the judge of <br />the performance thereunder by both the Owner and <br />Contractor, and shall render written decisions on all <br />claims, disputes and other matters in question between <br />the Owner and the Contractor. In the capacity of inter- <br />preter and judge, the Architect shall endeavor to secure <br />faithful performance by both the Owner and the Contrac- <br />tor, shall not show partiality to either, and shall not be <br />liable for the result of any interpretation or decision <br />rendered in good faith in such capacity. <br />1.4.10 The Architect shall have authority to reject Work <br />which does not conform to the Contract Documents, and <br />will have authority to require special inspection or testing <br />of the Work whenever, in the Architect's reasonable opin- <br />8181 -1978 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.