My WebLink
|
Help
|
About
|
Sign Out
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
R
>
RIDGE VIEW COMMONS
>
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:55:16 PM
Creation date
1/13/2010 2:35:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/27/1988
LONG TERM AGREEMENTS - NAME
RIDGE VIEW COMMONS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
154964 <br />ARTICLE 1 <br />THE CONTRACT DOCUMENTS <br />The Contract Documents consist of this Agreement, the Conditions of the Contract (General, Supplementary and <br />other Conditions), the Drawings, the Specifications, all Addenda issued prior to and all Modifications issued after exe- <br />cution of this Agreement. These form the Contract, and all are as fully a part of the Contract as if attached to this <br />Agreement or repeated herein. An enumeration of the Contract Documents appears in Article 7. <br />ARTICLE 2 <br />THE WORK <br />The Contractor shall perform all the Work required by the Contract Documents for WILLOW GLEN, <br />(Here insert the caption descriptive of the Work as used on other Contract Documents.) <br />(also known as Ridge View Commons) <br />a 200 -unit senior housing apartment complex, including a community <br />building with dining facilities. <br />ARTICLE 3 <br />TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />The Work to be performed under this Contract shall be commenced on the date stipulated <br />in the notice to proceed; <br />and, subject to authorized adjustments, Substantial Completion shall be achieved not later than <br />four hundred fifty (450) calendar days thereafter, with Substantial <br />Completion of the Phase I portion achieved within the first three <br />hundred sixty -five (365) calendar days. The Contractor agrees to <br />pay, as liquidated damages, the sum of Five Hundred Dollars ($500.00) <br />for each calendar day that either or both of the following conditions <br />exist: <br />(a) The Phase I portion remains uncompleted beyond the time for <br />substantial completion of Phase I. <br />(b) The entire Work remains uncompleted beyond the time for substantial <br />completion. <br />AIA DOCUMENT A101 • OWNER- CONTRACTOR AGREEMENT • ELEVENTH EDITION • JUNE 1977 • AIA. <br />01977 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D. C. 20006 A101 -1977 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.