My WebLink
|
Help
|
About
|
Sign Out
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
R
>
RIDGE VIEW COMMONS
>
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:55:16 PM
Creation date
1/13/2010 2:35:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/27/1988
LONG TERM AGREEMENTS - NAME
RIDGE VIEW COMMONS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 <br />FINAL PAYMENT <br />Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the <br />Contractor when the Work has been completed, the Contract fully performed, and a final Certificate for Payment has <br />been issued by the Architect, thirty -five (35) calendar days have elapsed after <br />Substantial Completion. <br />By: <br />ARTICLE 7 <br />1 549€34 <br />MISCELLANEOUS PROVISIONS <br />7.1 Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings <br />designated in those Conditions. <br />7.2 The Contract Documents, which constitute the entire agreement between the Owner and the Contractor, are listed <br />in Article 1 and, except for Modifications issued after execution of this Agreement, are enumerated as follows: <br />(List below the Agreement. the Conditions of the Contract (Central. Supplementary, and other Conditions), the Drawings, the Specifications, and any Addenda <br />and accepted alternates, showing page or sheet numbers In all cases and dues where applicable.) <br />7.3 Hardison, Komatsu, Ivelich & Tucker Drawings 7 through <br />C/ • 42.3 (total 2 /(0 sheets) dated =1/p i /se 4- 6/3/. 1988. <br />7.4 Specifications Divisions 1 through 16 dated February 2, 1988. <br />Addendum A to specifications, issued February 12, 1988. <br />Addendum 6 to specifications, issued March 2, 1988. <br />Addendum C to specifications, issued March 3, 1988. <br />Addendum D to specifications, issued March 4, 1988. <br />Addendum E to specifications, issued June 27, 1988. <br />7.5 Addendum A Supplementary Provisions. <br />7.6 Addendum B Guaranteed Maximum Cost Breakdown. <br />7.7 Addendum C Supplementary General Conditions. <br />7.8 Addendum D Women and Minority Owned Business Enterprise Plan. <br />7.9 Addendum E Housing Development Grant Provisions. <br />7.10 Addendum F HDG Drawdown Procedures <br />This Agreement entered into as of the day and year first written above. <br />OWNER- CONTRACTOR <br />EDEN,I40USING, INC., a California BOGARD CONSTRUCTION, INC., a California, <br />nonphofft corporation corporation <br />atherine . Merschel <br />Executive Director <br />By: Vy 41 6" <br />Victor Bogard <br />President <br />MA DOCUMENT A101 • OWNER- CONTRACTOR AGREEMENT • ELEVENTH EDITION • JUNE 1977 • AIM <br />01977 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D. C. 20006 A101 -1977 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.