My WebLink
|
Help
|
About
|
Sign Out
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
R
>
RIDGE VIEW COMMONS
>
RIDGE VIEW COMMONS - CONSTRUCTION LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:55:16 PM
Creation date
1/13/2010 2:35:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/27/1988
LONG TERM AGREEMENTS - NAME
RIDGE VIEW COMMONS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor delivers to the owner record drawings and other items <br />required pursuant to subparagraph 4.11.1, and the warranties, <br />instructions and maintenance manuals required to be furnished <br />pursuant to paragraph 4.12, and a final statement of the cost of <br />19. Add a new Section 9.9.6 as follows: <br />"9.9.6 If the Owner shall have furnished to the Contractor <br />a Building Loan Agreement or similar Agreement between Owner and <br />its lender, Contractor agrees to cooperate fully with Owner in <br />complying with the provisions thereof and agrees to furnish any <br />and all information, reports and certificates which are required <br />by the Agreement." <br />21). Add the following additional language to Section 11.1.1: <br />"11.1.1 Owner and Contractor acknowledge that the <br />insurance requirements set forth in the Contract Documents may be <br />required to be varied by the lender for the Project or by Owner's <br />insurance carrier and Contractor agrees to enter into suitable <br />modifications of the provisions hereof upon the request of the <br />Owner, provided Owner bears any additional cost occasioned <br />thereby." <br />21. Add a new Section 12.3.3 as follows: <br />"12.3.3 No change in the Work, whether by way of <br />alteration or addition to the Work, shall be the basis of an <br />addition to the Contract Sum or a change in the Contract Time <br />unless and until such alteration or addition has been authorized <br />by a Change Order executed and issued in accordance with and in <br />54984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.