Laserfiche WebLink
"CERTIFICATE Of <br />. SUBSTANTIAL <br />COMPLETION <br />AIA DOCUMENT C704 <br />sito <br />PROJECT: <br />(same. address) <br />TO (Owner): <br />r <br />L <br />Distribution to: <br />OWNER 0 <br />ARCHITECT 0 <br />CONTRACTOR D <br />FIELD 0 0 <br />OTHER <br />DATE OF ISSUANCE: <br />' PROJECT OR DESIGNATED PORTION SHALL INCLUDE: <br />• <br />ARCHITECT: <br />ARCHITECT'S PROJECT NUMBER: <br />CONTRACTOR: <br />CONTRACT FOR: <br />J CONTRACT DATE: <br />1 549£34 <br />• - The Work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial <br />Completion of the Project Or portion thereof desiptaled above h hereby established as <br />which h also the date of commencement of applicab wa required by t e Contract Documents, except as sated below. <br />DEFINITION OF DATE OF SUBSTANTIAL COMPLETION when <br />Arc Architect <br />le <br />of the Work or designated portion thereof Is the Date certifier! y the or teCt v. the <br />The Date of Substantial Coro( complete, to accordance with the Con'uact Documents, so the Owner f <br />construction h sufficiently thereof for the use <br />for which h Is m <br />intended, n expressed in the Contract Docucnu. <br />Work a designated Po <br />red by the Contractor and verified and amended by the Architect, Is <br />a tcf+uact e d hems hereto. T . The e failure to e completed include cJude any or corroded, any items on on such list does not alter the responsibility of the Contractor to conwlete at <br />Documents. The date of commencement of warranties for Items on the attached list will <br />bx thhe e datte 1o o of f fi fi nal l payment theun�Era otherwise agreed to in writing. Nit <br />BY <br />. ARCHITECT <br />The Contractor will complete or correct the Work onlhe list of items attached Iwreto within <br />from the above Date of Substantial Completion. <br />BY <br />• tTIfICATE Of SLIEVANTIAL COMPLETION • Art111276 EDITION • AI <br />Aa <br />AEA DOCUMENT CM Q WAWINCTON D C. 20006 <br />• .. - .. ...•-•.-•.. .•.nnI r•t / UrM /'T[ •Tl NfW y(heC AVr N W <br />DATE <br />DATE <br />days <br />CONTRACTOR Sion thereof <br />Work a de signated portion thereof as wbstantialiy.complete and will assume full posses (date) <br />The Owner accepts the (time) on <br />at <br />DATE <br />BY <br />OWNER utilities, damage to the Work <br />The responsibilities of the Owner and the Contractor for security, maintenance, heat, <br />and insurance shall be as follows: ehsurana conned dauld determine and review Murano w't" <br />o and coentte: Convector <br />(Pbre— O»'rhe /s end ContreCtO /s anal <br />AO secure comment of surety company, d any) <br />C704-197 <br />