Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />WATER PROJECTS <br /> <br /> Adjusted Budget <br /> Expansion Replacement <br />CIP # Fund Fund Total <br /> $55 345 <br /> BEGINNING BALANCE $2.464.856 $10,782.688 $13,247344 <br /> REVENUES: <br /> ESTIMATED REVENUES <br /> Residential Connection Fees 375.031 0 375.03 I <br /> Commercial Connection Fees 0 0 0 <br /> TOTAL FEE REVENUE $375.031 $0 $375.031 <br /> TRANSFER TO NEXT YEAR'S REVENUE (391.4~5 0 (391,4451 <br /> TRANSFER FROM PRIOR YEAR'S REVENUE 0 0 0 <br /> DSRSD Contribution - Recycled Wmer Study 2,297 0 2,297 <br /> qTEREST INCOME 61.863 333,867 395.730 <br /> TOTAL ESTIMATED REVENUES $47,746 $333.867 $381.613 <br /> FRANSFERS FROM: <br /> Water M&O Fund -- Polybu~lene Repairs 0 100.000 100,000 <br /> Water M&O Fund -- Replacement and Accrual 0 1.850,000 1,850,000 <br /> Water M&O Fund - Lease Pa~nent Series A & B Bond 0 575,186 575,186 <br /> TRANSFERS TO: <br /> General Fund -- CIP En~ineerin~ (116,739) (34,049 (150,788) <br /> Water M&O Fund -- Misc Malmenance Projects 0 (100,000 (I 00,000) <br /> General Fund - Utilit~ Cut Patchin~ 0 (40,000 (40,000 <br /> NET TRANSFERS IN/(OUT) ($116,739 $2,351,137 $2,234,398 <br /> TOTAL FUNDS AVAILABLE $2.395.863 $13,467.692 $15,863,555 <br /> Expenditures: <br />021008 Annual Automated Meter Reading Ratrofit 0 125,000 125,000 <br />ol 1o13 Annual Replacement of Polybutylane Service Laterals & Irrigation Lines 0 200,000 200,000 <br />01104o Annual Replacement of Water Meters 0 130,000 130,000 <br />ol Iooo Annual Water Replacement Projects 0 600,000 600,000 <br />011022 Chlorine Injection Sites 120,000 0 120,000 <br />Ol ~0~ 1 Control Valve Installations 0 64,929 64,929 <br />Ol IOlO Electrical Panel Upgrades and Restorations 0 40,000 40,000 <br />948056 LeesedDebt Pa3anents: Series A&B 287,593 575,186 862,779 <br /> Santos Ranch Road Pleasanton Ridge & Kilkare Water <br />011014 Transmission Main Replacemem Reserve 0 547,000 547,000 <br />011023 Vineyard Specific Plan: Water Tank, Lines & Pump Slation 0 1,150.000 1,150,000 <br />o11019 16-Inch Water Main on Rose Ave, Between Calico Lane & Valley 300.000 0 300,000 <br />oolooo Annual Water Replacement Projects 0 1,174,625 1,174.625 <br />oololo Electrical Panel Up~'ades & Restorations 42.987 83,606 126,593 <br />0o1025 Water Well Chemical Feed System Modification 62,112 188,411 250,523 <br />0o~o26 High Pressure Water Main: Montevino Dr - Sautine Way 90,000 0 90,000 <br />0o1o66 Water Loop Pipeline -Boode Loop 60,000 0 60,000 <br />o11013 Annual Replacement of Polybutylene Service Laterals & lrriFation Lines 0 63.647 63,647 <br />011015 Installation of a Variable Frequency Drive at Well No. 8 0 145,000 145,000 <br /> <br /> Ol IOl6 Installation ofa Pennanant Generator at Well No. 8 0 125,000 125~000 <br /> o11ol7 New Standby Power Generator: Water Portion 0 90,000 90,000 <br /> ollo2o Water Main Up~'ades for the Berual Property 35,000 0 35,000 <br /> o11o38 Construct New Pressure Reducing Sta to Complete Foothill Rd RezooinF Prqi 50.000 0 50,000 <br /> 8o2olo Water & Sewer Main - Vineyard to Foxboruu[th - Reimburse Developer 171,236 0 171,236 <br /> 941015 Del Valle Parkway Water Main Extension 397.304 0 397,304 ' <br /> 941027 Seismic VulnerabiliW, Study 0 35,000 35,000 <br /> 95100o Annual Water Main Replacement and Improvement Project 0 416,086 416,086 <br /> 951ol5 Water Quali~ Monitors - Phase Il (50%) 8.881 9.346 18,227 <br /> <br />Water FY03 Ql.xls 12/11/2002 <br /> <br /> <br />