My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
031610
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2010 11:28:43 AM
Creation date
3/10/2010 12:29:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/16/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC 2009 Strategic Expenditure Plan Update <br /> Updated Project Descriptions August 4, 2009 <br /> reauthorization. Ultimately, the option was approved by voters in 2004 as part of the Contra <br /> Costa Measure J Transportation half cent sales tax program. Some of the major benefits of the <br /> options include: 1) consistent with existing plans; 2) provides additional mobility to transit and <br /> HOV users; and 3) falls within a range of costs that are reasonably encompassed within the <br /> Measure C reauthorization. <br /> The project is one component of the I -680 Carpool Lane Gap Closure/ Transit Corridor <br /> Improvements. <br /> Status: <br /> A draft Project Study Report has been completed. Caftans certification is expected by <br /> September 2009. Construction is expected to begin in 2015. <br /> Phasing and Schedule: <br /> Construction of this project is expected to begin in 2015. <br /> Cost Estimates and Funding Sources: <br /> Cost (Millions, 2009) $82.00 <br /> Funding (Millions, 2009) <br /> Measure J (2009) $10.00 <br /> TVTDF <br /> Total Funding (Millions, 2009) $10:00 <br /> Funding Shortfall (Millions, 2009) $72.00 <br /> Kimley -Horn and Associates, Inc. Page 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.