Laserfiche WebLink
Civic Square r <br /> E w <br /> rn <br /> x <br /> E w a ry <br /> 0 w a ce 3 <br /> 7. Landscaping <br /> Check here if the landscape area is <10% of the total site area. Projects with <I0% iandscape area can only check up to 3 boxes in this section. <br /> a. No Plant Species will Require Shearing 1 <br /> b. No plantings are Listed on the Invasive Plant Inventory by the California Invasive Plant Council 1 <br /> El c. Specify Drought- tolerant California Natives, Mediterranean or Other Appropriate Species 1 <br /> d. Create Drought Resistant Soils: <br /> El i. Mulch All Planting Beds to a Depth of 2 Inches or Greater as Per Local Ordinance r 1 <br /> El ii. Amend with 1 Inch of Compost or as per Soil Analysis to Reach 3.5% Soil Organic Matter 1 <br /> e. Design Install High Efficiency Irrigation System <br /> i. Specify Smart (Weather Based) Irrigation Controllers 4 <br /> El i1. Specify Drip, Bubblers or Low -Flow Sprinklers for All Non Turf Landscape Areas 1 <br /> f Group Plants by Water Needs (Hydrozones) in Planting Plans Identify Hydrozones on Irrigation Plans 1 <br /> g. Minimize Turf in Landscape Installed by Builder <br /> El i. Do Not Specify Turf on Slopes Exceeding 10% or in Areas Less Than 8 Feet Wide f 1 <br /> O ii. Less Than 33% of All Landscaped Area is Specified as Turf AND All Turf has Water Requirement To Tall Fescue I 1 <br /> 8. Building Performance Exceeds Title 24 by at least 15 Requ <br /> Eder Me Percent Above the 2005 Version of Title 24 for Rosidcntial and Non Residential Potions of the Frnject. <br /> 20% a Residences: 2 Points for Every 1% Above 2005 T24 <br /> 10% b. Non- Residential Spaces: 2 Points for Every 1% Above 2005 T24 3 7 <br /> 9. Cool Site <br /> a. At least 30% of the Site Includes Cool Site Techniques 1 <br /> 10. Adaptable Buildings <br /> a. Include Universal Design Principles in Units <br /> 50% of Units 1 1 <br /> 80% of Units 1 <br /> b. LiveNVork Units Include A Dedicated Commercial Entrance 1 <br /> 11. Affordability <br /> a. A Percentage of Units are Dedicated to Households Making 80% or Less of AMI <br /> 0 10% of All Units 1 <br /> 20% 1 <br /> 30% 1 <br /> LI 50% or More 1 <br /> b. Development Includes Multiple Bedroom Units (At least 1 Unit with 3BR or More at or Less Than 80 %AMI) 2 <br /> B. SITEWORK Possible Points <br /> 1. Construction 8 Demolition Waste Management <br /> Divert a Portion of all Construction Demolition Waste: <br /> 0 a. Required Divert 50% y <br /> O b. Divert 65% 2 <br /> c. Divert 80% or more 2 <br /> 2. Construction Material Efficiencies <br /> O a. Lumber is Delivered Pre -Cut from Supplier (80% or More of Total Board Feet) 1 <br /> b. Components of the Project Are Pre Assembled Off -Site Delivered to the Project <br /> O 25% of Total Square Footage 2 <br /> 50% of Total Square Footage 2 <br /> 111 75 of Total Square Footage or More 2 <br /> 3. Construction Indoor Air Quality (IAQ) Management Plan <br /> 111 a. An IAQ Management Plan is Written 8 Followed for the Project r 2 <br /> C. STRUCTURE Possible Points <br /> 1. Recycled Aggregate <br /> a. Minimum 25% Recycled Aggregate (Crushed Concrete) for Fill, Backfill Other Uses 1 <br /> 2. Recycled Flyash in Concrete <br /> a. Flyash or Slag is Used to Displace a Portion of Portland Cement in Concrete <br /> 20% 1 <br /> 30% or More 1 <br /> MF GreenPoint Checklist 2005 Edition v.2 Page 3 of 8 <br />