Laserfiche WebLink
Civic Square E o <br /> E m <br /> its <br /> a <br /> cc <br /> 11. Durable Cabinets <br /> Install Durable Cabinets in All: <br /> O a. Residences I 0.85 <br /> b. Non Residential Areas l 0.15_ <br /> 12. Fumiture Outdoor Play Structures <br /> EI a. Play Structures Surfaces Have an Overall Average Recycled Content Greater Than 20% 1 <br /> O b. Environmentally Preferable Exterior Site Furnishings 1 <br /> El c. At Least 25% of All newly Supplied Interior Furniture has Environmentally Preferable Attributes 1 <br /> 13. Vandalism Deterrence <br /> a. Project Includes Vandalism Resistant Finishes and Strategies 1 <br /> F. OTHER Possible Points <br /> 1. Incorporate GreenPoint Checklist in Blueprints <br /> El a. Required Incorporate GreenPoint Checklist in Blueprints 1 Y <br /> 2. Operations Maintenance Manuals <br /> El a. Provide 0 &M Manual to Building Maintenance Staff f 1 <br /> b. Provide 0 &M Manual to Occupants I 1 1 <br /> 3. Transit Options <br /> a. Residents Are Offered Free or Discounted Transit Passes 2 <br /> 4. Educational Signage <br /> a. Educational Signage Highlighting Explaining the Project's Green Features is Included 1 <br /> 5. Vandalism Management Plan <br /> a. Project Includes a Vandalism Management Plan for Dealing with Disturbances Post Occupancy 1 <br /> 6. Innovation: List innovative measures that meet the green building objectives of the Multifamily Guidelines. Enter up to a 4 Points in each category. Points will be evaluated by <br /> local jurisdiction or GreenPoint rater. <br /> 0 Innovation in Community: Enter up to 4 Paints at left Enter description here <br /> 0 Innovation in Energy: Enter up to 4 Points at left Enter description here <br /> p Innovation in IAQ/Health: Enter up to 4 Points at left. Enter description here <br /> 0 Innovation in Resources: Enter up to 4 Points at left Enter description here <br /> 2 Project will eliminate over 10,000 sq ft of turf <br /> Summa <br /> Points Achieved from Specific Categories 22 I 47 I 7 I 20 I 14 <br /> Current Point Total 110 <br /> Project Has Met All Recommended Minimum Requirements <br /> MF GreenPoint Checklist 2005 Edition v.2 Page 8 of 8 <br />