My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
092110
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2010 11:36:46 AM
Creation date
9/15/2010 3:50:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2010
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bureau. The plans shall have the contractor's wet stamp indicating the <br /> California contractor license type, license number and must be signed. <br /> No underground pipeline inspections will be conducted prior to <br /> issuance of approved plans. <br /> (ii.) All underground fire protection work shall require a California <br /> contractor's license type as follows: C -16, C -34, C -36 or A. <br /> (iii.) All field testing and inspection of piping joints shall be conducted prior <br /> to covering of any pipeline. <br /> Questions shall be directed to the Fire Prevention Bureau Fire Marshal <br /> or Assistant Fire Marshal at 925 - 454 -2361. <br /> j. Any industrial /commercial development where recycled water is provided for <br /> fire protection shall meet City Water Resources Division installation standards <br /> and shall be in service prior to any construction above the slab or foundation. <br /> {end} <br /> Conditions of Approval /PUD -57 <br /> Appendix Conditions <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.