My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
092110
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2010 11:38:16 AM
Creation date
9/15/2010 3:54:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/21/2010
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. Where feasible, landscaping will be designed and operated to treat <br /> stormwater runoff. In areas that provide detention of water, plants that are <br /> tolerant of saturated soil conditions and prolonged exposure to water will be <br /> specified. Soil will be amended as required. <br /> g. Plant materials selected will be appropriate to site specific characteristics <br /> such as soil type, topography, climate, amount and timing of sunlight, <br /> prevailing winds, rainfall, air movement, patterns of land use, ecological <br /> consistency and plant interactions to ensure successful establishment. <br /> Landscaping will also comply with City of Pleasanton ordinances and policies <br /> regarding water conservation and with the State of California's Model Water <br /> Efficient Landscape Ordinance. A licensed landscape architect will verify the <br /> project's compliance with the State of California's Model Water Efficient <br /> Landscape Ordinance: 1) prior to the issuance of a building permit; and 2) <br /> prior to final inspection. <br /> h. Trash areas, dumpsters and recycling containers will be enclosed and roofed <br /> to prevent water run -on to the area and runoff from the area and to contain <br /> litter and trash, so that it is not dispersed by the wind or runoff during waste <br /> removal. These areas will not drain to the storm drain system, but to the <br /> sanitary sewer system and an area drain will be installed in the enclosure <br /> area, providing a structural control such as an oil /water separator or sand <br /> filter. No other area will drain into the trash enclosure; a berm will be installed <br /> to prevent such drainage if found necessary by the City Engineer /Chief <br /> Building Official. A sign will be posted prohibiting the dumping of hazardous <br /> materials into the sanitary sewer. Dublin San Ramon Services District <br /> (DSRSD) will be notified of the installation of the sanitary connection; a copy <br /> of this notification will be provided to the Engineering Division. <br /> i. All paved outdoor storage areas will be designed to minimize pollutant runoff. <br /> j. Prior to grading permit issuance a copy of the State Water Resources Control <br /> Board Notice of Intent (NOI) for coverage under the State Construction <br /> Stormwater General Permit for projects with clearing, grading and excavation <br /> exceeding the current standards will be submitted. <br /> k. All metal roofs will be finished to inhibit rust. <br /> I. Roof drains will discharge and drain away from the building foundation to an <br /> unpaved area wherever practicable. <br /> 16. Stormwater Construction Requirements. A Stormwater Pollution Prevention <br /> Plan (SWPPP) will be submitted for review and approval by the City Engineer <br /> prior to issuance of building or grading permits. The following construction Best <br /> Management Practices (BMPs), as well as any other applicable measure, will be <br /> included in the SWPPP and implemented. <br /> Conditions of Approval /PUD -80 <br /> Page 23 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.