My WebLink
|
Help
|
About
|
Sign Out
URBAN HABITAT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
U
>
URBAN HABITAT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 12:10:12 PM
Creation date
9/21/2010 12:07:29 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/17/2010
LONG TERM AGREEMENTS - NAME
URBAN HABITAT
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. ESA Team Qualifications <br /> TABLE 4 -1: KEY TECHNICAL STAFF QUALIFICATIONS (Continued) <br /> Name, <br /> Responsibility and <br /> Office Location Education Recent Similar Experience • <br /> Julie Larkin (cont) • Serves as Project Manager and /or Operations Manager for <br /> Sustainable Communities Program - Southern California Edison; <br /> APS Business Solutions Program - Arizona Public Service; and <br /> Enhanced Automation Initiative - California Public Utilities <br /> Commission. <br /> Dave Millar, LEED® B.S., Earth Sciences, • Energy consultant with deep expertise in climate change issues and <br /> AP University of California, Santa provides technical leadership on greenhouse gas emission inventory <br /> Energy and Green Cruz projects, economic and emissions modeling, policy /regulatory <br /> Building ' analysis, greenhouse gas verification, and climate action planning. <br /> B.A., Politics, University of <br /> Oakland California, Santa Cruz • Other areas of expertise include green building strategies, <br /> industrial energy efficiency studies, cost/benefit analysis. and <br /> regulatory compliance. <br /> • Provided assistance with developing the City of San Leandro CAP <br /> and Platte River Power Authority CAP. <br /> Fehr and Peers Technical Staff <br /> Mark Feldman M S , Industrial Engineering • Transportation Engineer who provides detailed travel demand <br /> Land Use and and Operations Research, forecasting and traffic operations analyses of numerous complex <br /> Transportation University of California, freeway interchanges and arterial corridors for PSRs, EIRs, other <br /> San Francisco Berkeley traffic analysis projects, and direct ridership modeling of transit <br /> B.A., Mathematics, Oberlin systems. <br /> College • Assisted with Mixed Use Trip Generation Research, which looks at <br /> the effects of development, density, diversity of land use, and other <br /> "D" variables to mix used developments. Also worked as Project <br /> Manager for the Bart Demand Management Study. <br /> Rob Rees, PE 6.5. Civil Engineering, I • A Civil Engineer and Traffic Engineer with over 20 years of <br /> University of California, Davis experience. Provides a wide range of transportation planning and <br /> Walnut Creek traffic engineering services including transportation and land use <br /> planning, bicycle and pedestrian planning, transit planning and <br /> parking studies. <br /> • Has managed several specific plans and general plans including, <br /> Oakland Oak Knoll and Alameda Point Mixed -Use Development. <br /> He has also worked on Berkeley Evaluation of BART and the <br /> MacArthur BART Access Study in Oakland. <br /> B. ESA Team Experience Overview <br /> The collective ESA Team has experience developing CAPs for Bay Area <br /> cities. We have deep experience in the key aspects of CAPS: GHG <br /> accounting, emissions forecasting, and emissions reductions plans. <br /> Climate Action Plans <br /> ESA and Town -Green recently completed the City of Martinez CAP. ESA <br /> and Town -Green refined and verified the City's existing community-wide <br /> GHG inventory (based on the ICLEI protocol), drafted a framework planning <br /> document that outlined goals and conceptual reduction strategies, conducted <br /> public workshops to explain the project and solicit ideas from City residents, <br /> 4 -6 City or Pleasanton Climate Action Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.