My WebLink
|
Help
|
About
|
Sign Out
URBAN HABITAT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
U
>
URBAN HABITAT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 12:10:12 PM
Creation date
9/21/2010 12:07:29 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/17/2010
LONG TERM AGREEMENTS - NAME
URBAN HABITAT
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. ESA Team Qualifications <br /> TABLE 4 -2: SUMMARY OF RELEVANT ESA TEAM EXPERIENCE (Continued) <br /> Relevant Highlights Project <br /> ESA (cont.) <br /> + Coastal watershed and Pescadero - Butano Watershed Assessment and Stewardship <br /> stewardship plan Plan <br /> • Multiple stakeholders ESA prepared a Watershed Assessment for the Pescadero- Bulano <br /> Watershed, in coastal San Mateo and Santa Cruz Counties. The <br /> Assessment focused on identifying factors limiting water quality and <br /> aquatic habitat, particularly freshwater habitat for coho salmon and <br /> steelhead (rout. Other goals of the project were to gain a sufficient <br /> understanding of the state of the salmon and steelhead fishery, and of the dynamic geomorphic <br /> processes that affect them, to serve as a basis for a future planning effort to restore the overall health of <br /> the Watershed. ESA involved stakeholders and other interested parties during the Assessment's <br /> development. The Assessment included a land use history of the Watershed, a survey of fish habitat, <br /> and a sediment budget that quantified erosion rates, sediment transport. and sediment deposition in the <br /> stream system. Using GIS analysis, this information was synthesized. and areas of the Watershed were <br /> prioritized for future conservation and restoration efforts. <br /> • Local experience Zone 7 Water Supply Master Plan <br /> • Water supply issues j ESA prepared a Program EIR examining both near -term and long -term <br /> water supply within eastern Alameda County. The El R provides project -level <br /> + CEQA analysis (EIR) 493... ' analysis for transfer of 15,000 afa in SWP entitlements from member <br /> districts of the Kern County Water Agency, as provided for under the <br /> Monterey Agreement. Analysis included impacts within the transfer agency <br /> service areas, impacts associated with participation in the Semi -tropic <br /> Groundwater Banking Program and impacts within the Zone 7 service area, primarily related to the <br /> cumulative capacity use of the South Bay Aqueduct and Lake Del Valle. At a program level, the EIR <br /> assesses Zone 7's long -term water supply program and identifies potential impacts and mitigation strategies <br /> associated with future supply types. The EIR also examined Zone 7's long -tens reality plan and salt <br /> I management plan, providing a framework for Zone 7 to implement individual projects as they are developed. <br /> + Local experience Zone 7 Flood Control Master Plan <br /> + Flood control plan -""Y ESA assisted in the preparation of a flood control master plan for Zone 7. <br /> After the project team determined the extent of flooding problems in the <br /> • Regulatory and Livermore Voile ESA identified enhancement o <br /> Wiley ppS ec and constraints <br /> permitting for biological and , recreational resources. Specifically, ty, E ESA conducted <br /> detailed biological assessments of individual capital projects and developed <br /> a mitigation program for capital and maintenance projects to provide for <br /> permit streamlining. The project team presented its findings in a series of <br /> technical memoranda. In addition, ESA reviewed the potential regulatory and permitting requirements with <br /> respect to the comingling of recycled water storage and floodwater retention associated with Zone 7's <br /> multiuse opportunities in Cope Lake, a former gravel- mining pit. The primary water quality issue involves the <br /> discharge of comingied recycled water and stormwater during storm events. <br /> + Local experience Zone 7 Groundwater Master Plan <br /> • General Plan buildout ESA prepared an EIR for the Zone 7 Well Master Plan, which identified well facilities and groundwater <br /> analysis management operations necessary to meet reliability goals associated with buildout of the adopted <br /> general plans within the Zone 7 service area. Zone 7 manages groundwater within the Livermore Valley <br /> CEQA (EIR) ) ' through conjunctive -use practices, including groundwater pumpage and subsequent recharge of <br /> + supply & imported Slate Water Project entitlements. The Main Basin provides approximately 240,000 acre -feet of <br /> Water Water <br /> s y ip & storage and is managed by Zone 7 to meet peak -day summer demands, drought -year reliability, and <br /> emergency supplies. As water demands within its service area increase over the next 15 years, an <br /> additional 39 million gallons per day of well production capacity would be necessary to meet these water <br /> supply and reliability uses, thus requidng 10 to 15 new production wells within the cities of Pleasanton <br /> and Livermore, and unincorporated Alameda County. The EIR evaluated the impacts associated with <br /> construction and operation of these well facilities over the next 20 years. <br /> + Local experience DWR South Bay Aqueduct Enlargement <br /> + <br /> CEQA analysis of .r -,. - ESA was an integral part of project development CEQA analysis, <br /> growth inducement and , ' Permitting, and pre -design phases for major facility improvements to the <br /> secondary effects of _ South Bay Aqueduct (SBA) system necessary to meet Zone 7 capacity <br /> growth - requirements. The SBA Improvement and Enlargement Project will bring <br /> the existing capacity of the water conveyance system up to its design <br /> capacity (300 cubic feet per second [cis]. CEQA analysis provided project specific analysis regarding <br /> I geohazards, drainage, biological resources, land use conflicts, and aesthetics. In addition. CEQA <br /> analysis addressed comprehensive issues such as growth inducement, secondary effects of growth, and <br /> cumulative impacts of the SBA project with other Zone 7 infrastructure projects. ESA developed a <br /> mitigation package dedicating over 250 acres of land at Bethany Reservoir to meet anticipated mitigation <br /> City of Pleasanton Climate Action Plan 4 -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.