My WebLink
|
Help
|
About
|
Sign Out
URBAN HABITAT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
U
>
URBAN HABITAT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 12:10:12 PM
Creation date
9/21/2010 12:07:29 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
8/17/2010
LONG TERM AGREEMENTS - NAME
URBAN HABITAT
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEMA a# <br /> technical services related the CEC's implementation of California's Renewables Portfolio <br /> Standard, the Emerging Renewables Program and the Customer -side Account. Recent project <br /> experience includes a feed -in tariff study, solar auditing plan and a small wind study. As the <br /> prime contractor, KEMA developed a project management website to facilitate communications <br /> and share files between the CEC and KEMA. <br /> • California Solar Initiative Technical Support Contract — Pacific Gas & Electric Company: <br /> Principal in Charge responsible for oversight of broad -based technical support contract to <br /> support Program Administrators in administering the CSI Program. Scope of work includes <br /> technical support, maintenance of CSI Handbook, facilitation of CSI Solar Forums, coordination <br /> of monthly CSI Program Administrator meetings, development of meeting agendas and note <br /> taking, and communications with stakeholder groups. <br /> • HECO Feed -In Tariff Program Support — Hawaiian Electric Power Company: Ms. Corfee is <br /> currently overseeing a project to develop a proposed Feed -In Tariff for the state of Hawaii. This <br /> project is to support the development and filing of the proposed HECO Companies Feed -In Tariff <br /> to the PUC. Project Scope included conducting a two -day workshop with the HECO Companies <br /> and the Consumer Advocate to identify key design components for the Feed -In Tariff. <br /> • California Mexico Border Energy Issues Program -- California Energy Commission: <br /> Project Manager of a multi- faceted research project with four distinct task areas. The first task <br /> area is the facilitation of hi- national meetings between U.S and Mexican officials and <br /> stakeholders in the energy industry. The second task area is a study of current and potential <br /> transmission and distribution capacity for Natural Gas and Electricity imports from Mexico into <br /> California. The third task area is a study of the potential for a cross- border emissions trading <br /> scheme. The fourth task area is an analysis of transportation and what opportunities exist for <br /> modal shifting of freight transport from truck to rail, and fuel switching from diesel to alternative <br /> fuels. <br /> • Platte River Power Authority Climate Action Plan: Principal -in- Charge, responsible for <br /> overseeing KEMA's services to develop a Climate Action Plan (CAP) for Platte River Power <br /> Authority, a municipal utility serving four cities in northern Colorado. Services also included <br /> development of a customized climate planning model. The goals of the CAP required reducing <br /> greenhouse gas emissions to 20 percent below 2005 levels by 2020 and 80 percent below 2005 <br /> levels by 2050. In developing the CAP, KEMA worked closely with the Platte River technical and <br /> financial team. Measures designed to reduce greenhouse gas emissions included energy <br /> efficiency, renewable energy, reduced power generation and fuel switching. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.