My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS 6 TO 13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
010411
>
11 ATTACHMENTS 6 TO 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 1:45:31 PM
Creation date
12/28/2010 1:45:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/4/2011
DESTRUCT DATE
15Y
DOCUMENT NO
11 ATTACHMENTS 6 TO 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> r --------- - - -- - - - - - - - - -, <br /> • • <br /> FEATURE OR MEASURE ELEECTIVE <br /> • ENFORCING INSTALLER THIRD j <br /> j AGENCY DESIGNER PARTY r <br /> I <br /> .,Fw .-.Ti ..t 1lAla,l 1 J • ..a.,; yi a lt' .' 1.. ...id 52t3a? 1 5'f"„ Y '�: d, tf+i .`e, Y ;,,... ,. <br /> �F. � <br /> A4.205.1 Radiant roof barrier is installed. ❑ r 0 O 0 • <br /> A4.205.2 Exterior shading at least 18 inches in depth is provided ❑ I 0 0 0 I <br /> on south and west windows. I I <br /> *7 .x , i i1 p . n..'4.. .:. .L, +J ( <br /> . ! • ! J.a,.J r . n i.1a: -.tka Y.` ''.. `]a. -, fr'f ' rri.,, ',. ‘ `r y <br /> A4.206.1 Third party blower door test is conducted and passed ❑ I 0 0 • I <br /> to verify building envelope tightness. <br /> =ii„ .* i \ 4 ...i, ' i x...1.11 .. a li s.!'a IA n; i 1' a .� :li , cc ir2 t~t'a A: _� o,, <br /> • r <br /> A4.207.1 Radiant, hydronic, ground source and other innovative I I <br /> space heating and cooling systems included in the proposed <br /> design shall be designed using generally accepted industry- ❑ I 0 0 0 I <br /> approved guidelines and design criteria. I I <br /> • • <br /> 1 1 • <br /> A4.207.2 An HVAC system commissioning plan is developed and I I <br /> 1 <br /> 1 the following items, as appropriate, pertaining to the heating 1 <br /> and cooling systems are inspected and certified by an r I <br /> independent third party agency: r • <br /> I I <br /> 1. Verify compliance with the manufacturers recommended ❑ 1 0 0 • 1 <br /> start -up procedures. I I <br /> 2. Verify refrigerant charge by super -heat or other methods ❑ r <br /> 1 0 0 r <br /> • I <br /> specified by the manufacturer. I <br /> • <br /> 3. Burner is set to fire at the nameplate input rating. ❑ r 0 0 • I <br /> 1 <br /> 4. Temperature drop across the evaporator is within the ❑ I 0 0 • 1 <br /> manufacturers recommended range. I I <br /> 5. Test and verify air flow to be within 10% of the initial design 1 • <br /> 0 0 • I • <br /> air flow. j r <br /> 6. Static pressure within the duct system is within the ❑ • 0 0 • I <br /> manufacturers' acceptable range. j I <br /> 7. Verify that the whole house and exhaust ventilation ❑ j 0 0 • j <br /> systems meet Title 24 requirements. r I <br /> ❑ � 0 0 • • <br /> 8. Verify that the recommended maintenance procedures and I <br /> schedules are documented and provided to the home owner. • r <br /> I I <br /> A4.207.2.3 Results of the commissioning inspection shall be • <br /> included in the Operation and Maintenance Manual required in ❑ 1 0 0 0 1 <br /> Section 4.410.1. r -- - - - - - j <br /> (- -- <br /> ----------- - <br /> City of Pleasanton 3 of 7 Residential Elective Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.