Laserfiche WebLink
(3) Temporary construction easements around the above-described <br />lands, as shown on the Vineyazd Avenue Realignment-Right-of- <br />Way/Easement Exhibit, dated May 7, 2002 and incorporated herein <br />by this reference, in the form attached as Exhibit B, to last until the <br />improvements have been accepted by the City. Such easements <br />shall provide that access to the Property by Property Owner and <br />Property Owner's tenants shall be maintained during the term of <br />the construction easement. <br />B. All rights-of--way and easements shall be granted within I S days of <br />Property Owner's receipt of request for same by the City's Director of <br />Public Works, who is hereby empowered to accept and record such grants. <br />C. The Director of Public Works shall request the dedications only in the <br />event: <br />(1) PG&E gives notice to the City that it intends to build its 230KV <br />transmission line in the realigned Vineyard Avenue and is moving <br />forward with construction; and <br />(2) the City has given its final authorization to constructing the <br />realigned Vineyazd Avenue and associated improvements. <br />D. If the Property Owner transfers the property for the right-of--way and/or <br />grant easements, the City shall, at the request of Property Owner, take <br />such steps as may be necessary to return said property and/or easements to <br />Property Owner in the event that (i) neither PG&E nor the City move <br />Revision #1, Draft Data Sales of California Development Agreement Page 7 of 16 <br />