Laserfiche WebLink
(2) The Additional Right-of--Way as shown in Exhibit C; <br />(3) Land necessary for the Sewer Pump Station, as described in <br />Exhibit E; <br />(4) Easements for the construction, operation, and maintenance of <br />described Mitigation Land, Storm Drains and Outfalls, and <br />Detention Basins as described in Exhibits D, F, and G; <br />(5) Temporary construction easements around the above-described <br />lands, as shown on the Vineyazd Avenue Realignment-Right-of- <br />Way/Easement Exhibit, dated May 7, 2002 and incorporated herein <br />by this reference, in the form attached as Exhibit H, to last until the <br />improvements have been accepted by the City. Such easements <br />shall provide that access to the Property by Property Owner and <br />Property Owner's tenants shall be maintained during the term of <br />the construction easement. <br />B. Property Owner agrees to use its best efforts to achieve the dedication of <br />the Gazin/Simoni Right-of--Way, connecting street, and Storm Drain and <br />Outfall easement as described in Recital D. <br />C. All rights-of--way and easements shall be granted within 15 days of <br />Property Owner's receipt of request for same by the City's Director of <br />Public Works, who is hereby empowered to accept and record such grants. <br />D. The Director of Public Works shall request the dedications only in the <br />event that: <br />Revision #2 Draft Lonestaz California, lnc. Development Agreement Page 9 of 21 <br />