My WebLink
|
Help
|
About
|
Sign Out
PC 2002-31
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2002
>
PC 2002-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:47:19 PM
Creation date
4/16/2003 7:34:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/14/2002
DOCUMENT NO
PC 2002-31
DOCUMENT NAME
VINEYARD AVINUE CORRIDOR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D. If the Property Owner transfers the property for the right-of--way and/or <br />grant easements, the City shall, at the request of Property owner, take such <br />steps as may be necessary to return said property and/or easements to <br />Property Owner in the event that (i) neither PG&E nor the City move <br />forward with construction of the improvements or (ii) all necessary grants <br />of Vineyazd Avenue right-of--way aze not obtained by the City. <br />IV. Construction of Improvements. <br />A. In the event PG&E facilities precede construction of the roadway <br />improvements, City shall ensure that the full roadway rough grading shall <br />be completed in conjunction with the PG&E project. <br />B. The City shall fund construction of the roadway improvements and <br />associated utilities shown in Exhibit D (the "Phase I Improvements). The <br />City shall make good faith efforts to ensure the timely construction of <br />these improvements insofaz as it is within its power to do so. The intent of <br />the parties is to have these improvements completed by September 1, <br />2003. <br />C. Phase II and Phase III improvements will be constructed in accordance <br />with the Specific Plan and conditions of approval. The funding of these <br />improvements is described in the Finance Plan, a copy of which is <br />attached as Exhibit E. <br />Revision #2, Draft Lin Development Agreement Page 8 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.