My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
021511
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2011 4:54:04 PM
Creation date
2/10/2011 2:13:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/10/2011
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hacienda TOD Standards and Design Guidelines Initial Study <br /> d) 1 lave sufficient water supplies avail tblc to serve the X <br /> project from existing entitlements and resources, or are new <br /> or expanded entitlements needed? <br /> e) Result in a determination by the wastewater treatment X <br /> provider which serves or may serve the project that it has <br /> adequate capacity to serve the project's projected demand in <br /> addition to the provider's existing commitments? <br /> f) Be sen-ed by a landfill with sufticier t permitted capacity X <br /> to accommodate the project's solid waste disposal needs? <br /> g) Comply with federal, state, and local statutes and X <br /> regulations related to solid waste? <br /> The City of Pleasanton currently supplies domestic water to Hacienda. The Dublin San Ramon Services <br /> District currently treats wastewater from Hacienda at its treatment plant near 1 -680 and Stoneridge <br /> Drive. Wastewater collection facilities within the City limits are maintained and operated by the City of <br /> Pleasanton. The Pleasanton Garbage Service provides refuse disposal to the project vicinity through a <br /> franchise agreement with the City and transports solid waste to a landfill site on Vasco Road. PG&E <br /> provides gas and electrical service to Hacienda. <br /> Significance Criteria <br /> The impact questions above constitute the significance criteria for this environmental topic. <br /> Discussion of Checklist Items <br /> Less- than - Significant Impacts. Capacity of the Dublin San -Ramon Sanitary District ( DSRSD) treatment <br /> plant is 17 million gallons per day (mgd), of which Pleasanton's allotted share is 8.5 mgd. Pleasanton is <br /> currently using about 6 mgd of its allocation. Therefore, adequate capacity exists to serve the <br /> development accommodated by the proposed zone change. DSRSD has a maximum treatment plant <br /> ultimate design capacity of 20. mgd, although it has not begun expansion planning for its current <br /> sewage treatment plant. <br /> The three development sites allowed under the Hacienda TOD Standards and Guidelines would <br /> generate an estimated total average dry weather wastewater flow of 270,000 gallons per day. In peak <br /> dry weather periods this additional wastewater flow is estimated to increase to an additional 450,000 <br /> gallons compared to what was planned in City's Wastewater System Master Plan dated August 2007. <br /> There is sufficient pipeline capacity in local sewer lines that are immediate and downstream of these <br /> three sites for average and peak dry weather flow discharges. However, this additional sewer flow <br /> impact would exacerbate the capacity issues in the existing sewer trunk main (East Amador Trunk <br /> Sewer, EATS) where this additional discharge would flow into. Although based on the City's <br /> engineering analysis it is estimat: d that there is sufficient capacity remaining in the EATS pipeline for <br /> one of the vacant sites to be developed with no additional improvements in place, development of the <br /> second and third sites would require repair to an existing "currently out of service" sewer trunk main, <br /> and construction of a new pump station. The cost of these improvements is estimated at $3.5 million, <br /> and would be financed utilizing the City's sewer Development Fund, and Replacement Improvement <br /> Fund. The split between the two sewer funds will be based on a pro rata share between the existing <br /> City sewer customers and future development in accordance with a benefit assessment analysis. <br /> These improvement projects are currently included in the City's Capital Improvement Program to be <br /> constructed in fiscal year 2013/2016 and are planned to be moved forward to 2011/2012 (with City <br /> Council approval) to accommodate the additional sewer discharge from the new housing units. <br /> Draft, Subject to Revision 32 2/11/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.