My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
021511
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2011 4:54:04 PM
Creation date
2/10/2011 2:13:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/10/2011
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local governments in the Bay Area have expressed the need for funding that is more flexible <br /> than the current TLC program and is targeted specifically toward implementing development <br /> projects that take advantage of transit access. The recent evaluation of the TLC program <br /> recommended "continuing to strengthen the land use connection within the TLC Program" <br /> by supporting TOD and infill projects. TOD and infill are both critical to the continued healthy <br /> growth of the Bay Area, by reducing Vehicle Miles of Travel (VMT), reducing the combined <br /> costs of housing and transportation, and making more efficient use of transportation <br /> infrastructure. <br /> Figure 1 Household Greenhouse Gas Emissions In the Bay Area <br /> This map depicts household CO2 emissions from automobile use only. <br /> r . . <br /> L" 4- t <br /> net • hA <br /> . <br /> T <br /> t ` �. �C / <br /> l• � <br /> y <br /> \ 1 _ . <br /> TTTy �I: n a . <br /> e <br /> w w <br /> pm,* <br /> TT r yf,! <br /> X 1 <br /> t <br /> a f Bt4I 1 <br /> Sk (�I 1 ��. Wiles/ <br /> a.'" <br /> J <br /> Otl4H I r <br /> Sr Hark• <br /> lei. <br /> tit - - <br /> Source: Center for Neighborhood Technology, 2008 <br /> However, even with its considerable success, the TLC program, with its fixed two -year funding <br /> cycle and limited number of fundable projects and project types does not go far enough to <br /> meet the challenges Bay Area communities face as they try to intensify land uses near <br /> transit. After station area or downtown plans have been adopted, TOD and infill development <br /> projects still face significant financial and regulatory barriers that impede construction. The <br /> financial barriers include higher land costs around transit stations, infrastructure upgrades <br /> needed to support increased density, the need to assemble small parcels of land to reach <br /> Sa•riers to 1 O and Regional Funding Needs 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.