My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
021511
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2011 4:54:04 PM
Creation date
2/10/2011 2:13:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/10/2011
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hacienda TOD Standards and Design Guidelines Initial Study <br /> Pleasanton General Plan BMP <br /> BMP #3: Where feasible, incorporate solar roofs (or other alternative energy measures) into <br /> commercial development sufficient to meet 12.5 percent of the building's annual energy <br /> usage. Residential development to he solar- ready, including proper solar orientation, <br /> electrical conduit installed for solar electric system wiring, plumbing installed for solar hot <br /> water system, and space provided for solar hot water storage tank. <br /> BMP #4: Require transit and bicycle /pedestrian connections in new development, where <br /> feasible. <br /> BMP #5: For commercial /industrial projects, prepare and implement a voluntary Trip <br /> Reduction Plan, using the resources available through the City of Pleasanton's <br /> Transportation Systems Management program as described in Chapter 17.24 of the <br /> Masan/off Municipal Code. 'Drip reduction goal of 15 percent within five years and 25 percent <br /> within 10 years, compared to "business as usual." <br /> BMP # 6: Require priority facilities for alternative- fueled vehicles such as priority parking <br /> and parking facilities, where feasible. <br /> BMP # 7: Development anti demolition to comply with the City's Construction and Demolition <br /> Debris Ordinance. <br /> Bi\IP # 8: In new commercial and multifamily projects, include facilities to accommodate <br /> the commercial and /or community recycling of plastic, paper, green waste, and food waste. <br /> BMP #9: Incorporate "heat island" treatments that include cool roofs, cool pavements, and <br /> strategically placed shade trees. <br /> Source: Pleasanton General Plan 2095 -2021 <br /> Discussion of Checklist Items <br /> Less than Significant Impacts. <br /> Operational Emissions. In assessing whether GHG emissions from the proposed project are <br /> considerable, the City considered whether the proposed project would result in more greenhouse gas <br /> emissions per year from operations than the existing entitlement on the project sites. The existing <br /> entitlement assumed in General Plan land use analyses is 732,832 square feet of office space and 333 <br /> apartments. If approved, the proposed project would replace these assumed entitlements with 1,595 <br /> apartments and 30,000 square feet of neighborhood shopping center land uses. Table 4 below <br /> compares the proposed project :o the existing entitlement. <br /> Table 4 <br /> Land Uses, Proposed and Existing* <br /> Project Apartments Office Neighborhood <br /> Shopping Center <br /> Pro.osed Project 1,595 units 0 sq. ft. 30,000 sq. ft. <br /> Existin: Entitlement 333 units 732,832 sq. ft. 0 sq. ft. <br /> Notes: The `Existing Entitlement" is the entitlement assumed in previous General Plan land use analyses fn the project <br /> sites. <br /> Draft, Subject to Revision 18 2/11/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.