My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
021511
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2011 4:54:04 PM
Creation date
2/10/2011 2:13:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/10/2011
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hacienda TOD Standards and Design Guidelines Initial Study <br /> Discussion of Checklist Items <br /> Less- than - Significant Impacts. The proposed project would not expose people to potential health <br /> hazards through the routine transport, use, storage or disposal of hazardous materials. Future residents <br /> and tenants at the potential neighborhood - serving retail establishments due to development under the <br /> Standards and Design Guidelines may use or store relatively small amounts of hazardous materials. <br /> During construction on the project sites contractors would use some hazardous materials. Hazards <br /> associated with those materials would be reduced to less-than-significant levels by compliance with State <br /> and federal transport, storage, and disposal requirements. No additional mitigation is warranted. This <br /> issue will be addressed in more detail, including any- impacts on nearby schools, in the environmental <br /> review documents at the time a development plan is proposed for the project sites. <br /> No toxic air contaminant would result from the proposed zone change, and no worse impacts than <br /> could occur under the existing zoning of the sites could occur due to project implementation. The issue <br /> of toxic air contaminant emissions will he addressed in the environmental review documents at the time <br /> a development plan is proposed for the project sites. <br /> No Impacts. Regarding airport hazards, all three sites are located outside both the General Referral <br /> Area and the Height Referral Arca and the project would have no impact on an airport. <br /> The City has adopted a Comprehensive Emergency Management Plan to provide for the safety of the <br /> community in the event of a major emergency such as an earthquake, flood, fire, nuclear accident, civil <br /> disturbance, or hazardous materials spill. The plan provides the basis for direction and control of <br /> emergency operations and contains task assignments for City personnel under emergency conditions.' <br /> Any future development resulting from the zone change would be subject to the City's Emergency <br /> Operations Plan. <br /> The project sites are infill sites in an urban area and are not located close to any wildlands. No wildland <br /> fires would impact the area. <br /> 3 City of Pleasanton Comprehensive Emergency Management Plan, Revised September 26, 2005 <br /> Draft, Subject to Revision 21 2/11/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.